E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Franklyn Garris
<br />13. ROLE IN THIS CONTRACT
<br /> Project Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />3
<br />b. WITH CURRENT FIRM
<br />2
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Ross Engineering, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S. in Civil Engineering, Universidad Iberoamericana 2016
<br />B.S. Civil Engineering, Florida International University
<br />College of Engineering, 2017
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />FDEP Qualified Stormwater Management Inspector License
<br />OSHA (10 hours)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Hallandale Beach Ingalls Park
<br />Hallandale Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Garris assisted the Project Manager for the redesign of the park. He was involved with the design for the drainage and grading for the new
<br />sidewalks, parking lot and pavilions. As part of this project, the City Hallandale requested for all of the existing sidewalks surrounding the park to be
<br />extended to 8’ sidewalks. Coordinated was closely coordinated with the Landscape Architect for the relocation of the existing trees as well as
<br />relocating existing catch basins. Permits for onsite and offsite were obtained from the City of Hallandale Beach, Broward County EPD, and FDOT
<br />drainage connection permit since this site was within 500’ of an FDOT right-of-way. Mr. Garris inspected the site during construction to ensure that the
<br />project was constructed in accordance with the design plans. He also reviewed and approved the shop drawings and certified the drainage with
<br />Broward County EDP. Contract Amount: $25,000; Role: Project Engineer/Inspector
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Forest Hills Elementary School
<br />Palm Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Garris was the Project Engineer to help with the drainage design for the flooding issue at this school in Palm Beach. Mr. Garris provided grading
<br />and drainage design solutions to help alleviate the flooding by the portables and sidewalks. New rainwater leaders were designed to be connected to
<br />the drainage system and the new system will connection to the existing main drainage system. Project has been permitted with the Palm Beach
<br />County School District and is currently under construction. Contract Amount: $12,000; Role: Project Engineer
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Dade County Water and Sewer Department NW 22nd Ave Wastewater
<br />Collection/Transmission System Expansion and Water Distribution Systems
<br />Improvement for the North Sub-Basin (D2-C-1), Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019 - 2023
<br />CONSTRUCTION (If applicable)
<br />Varies
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Garris assisted the Project Manager to design the wastewater collection and transmission system and improve the potable water distribution
<br />system to the commercial and industrial parcels along the North Basin, north of NW 22nd Avenue. This design included 11,500 linear feet of new 8”
<br />and 12” sewer main, 850 linear feet of force main, and 5,800 linear feet of 8”, 10” and 12” watermain along NW 22nd Ave. All the residents in that
<br />area will be required to abandon their existing septic systems and connect to the new sewer lateral that will be designed for each house. Through
<br />this new project, each property will be provided a new 6” sanitary sewer lateral, new water meter and water service that is connected to the new
<br />mains in the street. Const. Costs: $8.5M Role: Project Engineer
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Dade Water and Sewer Department Watermain Replacement along
<br />Alhambra Circle, Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2019
<br />CONSTRUCTION (If applicable)
<br /> 2020 - 2021
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Garris assisted the Project Manager to design 1,800 linear feet of new 8” dip watermain to replace the existing 3” shallow pipeline in that area.
<br />Mr. Garris was also responsible for all the utility locates in that area, MOT plans, specification for Miami Dade Water and Sewer Department,
<br />permitting and the cost estimate. The watermain had to be offset from the median due to the large trees’ roots destroying the pipe. Construction
<br />Amount: $315,000; Role: Project Engineer
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Palmetto Senior High School
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2021
<br />CONSTRUCTION (If applicable)
<br />2019 - 2021
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Garris assisted on the grading plans, final permitting, and certification of the 120,900 SF of new phased construction for the 18-acre High School.
<br />He was one the inspectors onsite for the drainage and sewer construction installation. Phase 1 of the construction has been completed. Const. Cost:
<br />$ 40M Role: Project Engineer