Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project) <br />20. EXAMPLE PROJECT KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State)22. YEARS COMPLETED <br />City of Hallandale Beach Continuing Services Contract – <br />Professional Engineering Services, Hallandale Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 Tasks vary <br />23. PROJECT OWNER’S INFORMATION <br />a.PROJECT OWNER <br />Synalovski Romanik Saye (Prime) <br />b.POINT OF CONTACT <br /> Merrill Romanik <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />954-961-6806 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Ross Engineering, Inc. was awarded this continuing services contract as the sole civil engineering sub consultant to provide <br />typical engineering design services <br />City of Hallandale Beach General Engineering Services Sidewalk/ADA Master Plan Project - project to create a Masterplan of the City's <br />sidewalks and connectivity. The assignment was to identify deficiencies and introduce solutions for sidewalk connectivity allowing for <br />safe pedestrian usage including Americans with Disability Act (ADA) improvements for proper handicap access. A complete survey was <br />performed throughout the city to analyze the condition at each intersection and Ross Engineering assisted the project Manager to <br />provide connectivity solutions. <br />City of Hallandale Beach Ingalls Park, Hallandale, FL – project included the complete redesign of the park including all the drainage and <br />grading for the new sidewalks, parking lot and pavilions. As part of this project, the City Hallandale requested for all of the existing <br />sidewalks surrounding the park to be extended to 8’ sidewalks. Ross Engineering, Inc. coordinated closely with the Landscape Architect <br />for the relocation of the existing trees as well as relocating existing catch basins. Permits for onsite and offsite were obtained from the <br />City of Hallandale Beach, Broward County EPD, and FDOT drainage connection permit since this site was within 500’ of an FDOT right- <br />of-way. This project is currently under construction. <br />5. Firms from Section C Involved with this Project <br />a. <br />(1) Firm Name <br />Ross Engineering, Inc. <br />(2) Firm Location (City and State) <br />Miami, FL <br />(3) Role <br />Civil Engineering <br />b. (1) Firm Name (2) Firm Location (City and State)(3) Role <br />Page 42