My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 10 <br />D. Project Approach and Understanding <br />SCHEDULE AND BUDGET CONTROLS <br />TO ASSURE SUCCESSFUL PROJECTS <br />UES will utilize our standard proven control systems <br />to manage the schedule and budget for this <br />project. Through the Project Director’s initial project <br />setup, the weekly reports, and critical path project <br />scheduling, UES has established a stellar record of <br />successfully completing projects on time and within <br />budget. The following controls will be utilized to <br />maintain schedule and budget. <br />1. The Project Manager will conduct a project <br />kick-off meeting with the project personnel, <br />specialists, and the Project Director and will <br />address: <br /> ■The scope of services <br /> ■The schedule for each element of the work <br /> ■The budget for each element of the work <br /> ■Responsibilities for each element of the work <br />2. A written work order will be distributed, which <br />will include: <br /> ■The scope of services <br /> ■The schedule <br /> ■The budget <br /> ■Any special instructions <br />3. The Project Manager will communicate <br />daily with the project personnel to make a <br />comparison of actual progress to schedule <br />4. The Project Manager will review the work <br />effort weekly for comparison with actual work <br />progress <br />5. The Project Director also reviews all projects for <br />budget status <br />QUALITY/COST CONTROL <br />UES employs strict quality control/quality assurance <br />procedures in all aspects of our work. UES has a <br />proven record for completing municipal projects on <br />time and within budget. We realize that the quality <br />of a product is not controlled by a review at the end. <br />Instead, it must be built into the project from the <br />beginning. As a result of our continued work with <br />government agencies, our staff has an exceptional <br />understanding of all scheduling and budget <br />requirements and processes to successfully deliver <br />each project. <br />Our experience in providing similar services <br />provides us with a great basis for understanding <br />the requirements of this project, and having the <br />in-house resources to control the complete project <br />with regard to our high standards for schedule <br />commitment, budget control and quality. Because <br />of these items, we can confidently state that we will <br />successfully complete the projects on schedule and <br />under budget. Every report prepared for clients is <br />authored by a qualified professional that has the <br />experience and education to perform the required <br />services. The final report is reviewed by a senior <br />level reviewer with over 15 years experience. <br />TECHNOLOGY AND <br />EQUIPMENT CAPABILITIES <br />UES relies upon a comprehensive system of <br />software, both licensed and proprietary, to <br />successfully manage our day-to-day operations and <br />all aspects of a project. <br />At the top level, our company utilizes Microsoft <br />Windows 10 on all PCs in conjunction with Office <br />365, Sophos Cyber Security, Fortinet Firewall and <br />Ransomware, a secured VPN, and GoToMeeting. <br />But, at the center of our operations side lies <br />Deltek Vision. Vision is an established industry <br />standard and used extensively throughout the <br />A/E/C community. This software serves as our main <br />database capturing every project detail, such as the <br />scope of work, duration, subconsultants used, and <br />primary personnel. It also houses all of our client- <br />base information and allows for detailed report <br />generation. Another important function of Vision <br />is billing. The book-keeping capabilities of this <br />component are made possible due to the massive <br />amount of captured project and client information.
The URL can be used to link to this page
Your browser does not support the video tag.