My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 9 <br />D. Project Approach and Understanding <br />GEOTECHNICAL <br />SERVICES APPROACH <br />In order to properly assist the City of Sunny Isles <br />Beach with their Geotechnical needs, it is imperative <br />to, first understand their needs and constraints in <br />order to perform a comprehensive and accurate <br />geotechnical exploration. Once discussions with <br />the City’s project manager have been established, <br />a boring location plan will be presented to the PM <br />for further discussion. The boring plan is developed <br />by reviewing the site plan and the existing site <br />conditions and identifying the necessary soil <br />parameters. The boring depths are determined <br />based upon the structural loading conditions <br />provided by the structural engineer or by our past <br />project experience in the absence of data. <br />After approval by the City, a drill crew will be <br />mobilized to the site in order to perform the <br />field exploration. The drill crew consists of an <br />experienced driller/crew chief and a helper. The <br />drill crew will perform the field exploration, take <br />logs of the findings and place samples in clean <br />glass jars. The jars will then be returned to our <br />laboratory for further classification and testing. <br />After 24 hours, the water tables will be re-checked <br />for stabilized readings. <br />Once the field and laboratory work have been <br />completed to the satisfaction of the project <br />managers, a geotechnical report will be prepared <br />under the direction of a professional engineer (PE) <br />and reviewed by the Contract Manager, Reinaldo <br />Villa, MS, PE and will include the information <br />necessary for the City of Sunny Isles’ project <br />manager to proceed with his labors. Typical reports <br />will the following at a minimum: <br /> ■Soil boring logs and classifications; <br /> ■Existing groundwater levels and estimated seasonal <br />high levels; <br /> ■Potential constraints to development <br /> ■Foundation recommendations; <br /> ■Anticipated settlement; total and differential; <br /> ■Pavement design recommendations; <br /> ■Site preparation recommendations; <br /> ■Retention pond drawdown/recovery analysis; <br /> ■Other concerns as appropriate (groundwater contours, <br />berm stability, etc.) <br />PROJECT TEAM AND MANAGEMENT PLAN <br />UES prides itself on the level or work performed. <br />Our Geotechnical team consist of highly skilled <br />Engineers specializing in Geotechnical sciences <br />are tasked with delivering the timeliest service to <br />our clients. Our ability to respond to our client’s <br />needs in a timely manner is what sets us apart in <br />our industry. Our staff consists of junior and senior <br />level engineers with experiences ranging between <br />5 to +20 years. Weekly meetings are held in order <br />to assess different projects, their progress, potential <br />savings and development approaches. It is through <br />these meeting that the City of Sunny Isles Beach will <br />get the benefit of not one excellent engineer but a <br />whole team. <br />BUILT FOR SUCCESS <br />UES strives to maintain focus on the following <br />objectives for each project. First, we establish a <br />clear understanding of a client’s needs, goals, and <br />contractual requirements. <br />Then, we seek to gain a clear understanding <br />of a client’s work philosophy and operational <br />procedures. UES maintains an extensive amount <br />of equipment and has a large resource pool of <br />technicians readily available. <br />We also have a document control/record keeping <br />system which allows expedited report preparation <br />and retrieval of archived reports, drawings, and <br />critical documentation related to the project. There <br />is an integral Quality Assurance/Quality Control <br />(QA/QC) system in place which helps UES maintain <br />its level of quality. <br />A financial management system has been <br />established with an invoicing system designed <br />exclusively to service the client, enabling seamless <br />processing of project costs. Finally, UES has an <br />advanced level of detailed knowledge pertaining <br />to regulatory agency mandates and guidelines <br />governing a particular task or scope of work. UES <br />has found this integrated project approach to be an <br />important tool for accomplishing the objectives of a <br />given project for a client. <br />
The URL can be used to link to this page
Your browser does not support the video tag.