Laserfiche WebLink
Universal Engineering Sciences | 27 <br />E. Qualification Information and Assigned Personnel <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Muss Park Pavilion (Miami Beach, FL)2018 <br />City of Miami Beach Capital Improvements <br />Universal Engineering Sciences <br />UES served as Special Inspector during construction of the pavilion, playground and seawall restoration <br />portions of the project. Materials testing services included in-place density testing, laboratory <br />compaction testing, laboratory compressive strength testing of concrete cylinders, field concrete <br />testing, and masonry grout testing. <br />UES also performed Special Inspection of all auger cast-in-place pile foundations supporting the <br />proposed pavilion. UES also performed rebar and sheet pile wall inspection for the proposed bulkhead <br />wall restoration. During construction, UES also monitored vibration activities with seismographs to <br />ensure vibration levels were within tolerable limits. <br />UES coordinated services between West Construction (General Contractor for pavilion construction) <br />and Kiewit Infrastructure South Co. (seawall contractor) for materials testing and inspection services on <br />behalf of the City of Miami Beach. <br />Eric Arencibia, PE 305-673-7071 <br />N/A <br />3 <br />Medley, Florida Materials, Foundation and <br />Structure Inspection