Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)G-72E Control Structure, Hialeah Gardens, Florida <br />FDOT D6 & SFWMD Daniel Raymat, P.E.(305) 338-7782 <br />1 <br />2019 2020 (Anticipated) <br />Construction Document preparation for South Florida Water Management District's G72-E Control Structure within the (SFWMD) C-7 canal. <br />Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile walls, cast in place wing walls and <br />two spilling well steel platforms, preparation of construction cost estimates and project specifications. <br />The proposed control structure is approximately 90ft long x 20' high. The cast in place box culvert is a twin box 7' wide x 7' high. <br />The proposed steel sheet pile walls are anchored, and range from 15' to 25' in height with a total length of 90'. <br />The proposed spilling well platforms are approximately 23' long, composed of steel framing supported on precast piles. <br />Approximate Construction Cost is $2.0M. This design project requires extensive coordination to ensure constructable plans are prepared, <br />overall structure dimensions were optimized for functionality and operations via multidisciplinary coordination workshops. <br />Chrome Engineering, Inc.Miami, Florida Structural Engineer <br />(Pictures of similar project) <br />168