My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tierra South Florida, Inc. (TSF)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Tierra South Florida, Inc. (TSF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:29:06 AM
Creation date
8/21/2020 11:27:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />RFQ# 18-05-24 Architectural and Engineering Consulting Services: Construction Testing and Inspections <br />RFQ# 20-70-01 <br />Continuing Professional Consulting Services <br /> <br />PROJECT APPROACH <br /> Throughout our experience with continuing contracts, we have successfully utilized a project approach which we propose for this contract. Each project will have different milestones and deliverables. However, these items will be discussed, and timetables set at the initial scope meeting. Our representatives will meet those due dates and deadlines. Our proposed project approaches for geotechnical, construction materials testing services, and inspections are listed below: Geotechnical Project Approach <br /> Task Order from the City of Sunny Isles Beach <br /> Review Site Plan with City / USGS Map / USC Soil Survey / Aerial Photos <br />Identify possible unsuitable soils, illegal dumping, and other potential areas of <br />concern/interest. <br /> Site Visit / Reconnaissance <br />Determine site accessibility, if site clearing is necessary, presence of overhead power <br />lines for vertical clearance, and MOT needs <br /> Submit Proposal Based on Scope of Services Upon approval <br />Inform Project Manager – Work Schedule <br />Utility Clearance / Meet Maintenance / GPR <br /> Inform City’s Project Manager <br />Work Schedule <br /> Issue preliminary findings to the City <br /> Prepare report - includes Soil Management Plan <br />Review by Senior Author QA/QC <br /> Issue Final Report with Invoice <br /> <br />Construction Material Testing Project Approach <br /> TSF works with contractors daily to complete as-needed services. Our approach centers on our philosophy to protect the Owner’s interests, and it ensures that all work performed flows smoothly throughout the duration of the project. We believe that maintaining clear communication provides efficient and responsive service, which then leads to projects consistently being completed on time and within budget. At the beginning of each testing project, TSF schedules a preconstruction meeting with the contractor to introduce our personnel assigned to the project. TSF also addresses the scope of work, scheduling, cost saving strategies, and our standard 24-hour response times. For each task order, Contractors call or email our office to schedule work to be performed. We ask for 24 hours’ notice; however, TSF makes every effort to accommodate last minute requests as well. All work is performed as discussed in the preconstruction meeting. <br />16
The URL can be used to link to this page
Your browser does not support the video tag.