My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M.C. Harry & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M.C. Harry & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:47:40 AM
Creation date
8/21/2020 11:47:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Lourdes Solera, FAIA, <br />LEED AP <br />13. ROLE IN THIS CONTRACT <br /> <br />Sr. Project Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />32 <br />b. WITH CURRENT FIRM <br />21 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Architecture, 1987 - Mississippi State University <br />Master of Architectural History, 1991 - University of Virginia <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1993 - Architecture / Florida (#14445) <br />2009 - LEED AP <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />President – American Institute of Architects (AIA) Miami Chapter – 2004 / Recipient of the prestigious Florida AIA <br />Pullara Award for outstanding service – 2005 / Ms. Lourdes Solera AIA, has been a former member at the City of <br />Miami Historic and Environmental Preservation Board and will be responsible for guiding the design process to <br />recapture the original splendor of the Freedom Tower. She currently serves on the Florida Board of Architecture and <br />Interior Design and is an adjunct professor or architectural history at Florida International University <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade County Public Schools <br />A/EPC Miscellaneous Services <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />2008 <br />Architect / Project Manager: These services include preparation of design and contract documents for projects <br />that encompass additions, remodeling, renovations and repairs and ADA surveys and implementation. Projects <br />under $1 million <br />b <br />(1) TITLE AND LOCATION (City and State) <br />Royal Oaks Park Master Plan and Community Center - Town of <br />Miami Lakes <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTIION (if applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />The $2.2mil facility is located in the heart of a residential community and offers 4 athletic fields for soccer and <br />football, open playfield areas, a tot lot/playground area, picnic pavilions, exercise/bike trail, and a concession stand. <br />The 8,700sf community center received LEED Gold Certification. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade Parks & Recreation - Southridge Park Community <br />and Aquatic Center <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Current <br />CONSTRUCTION (if applicable) <br />Current <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Planning and Design services for a 15,000sf facility with a large two story colonnade defining primary circulation <br />through the complex and linking the community center multipurpose rooms and fitness center with a splash pad and <br />8 lane competition swimming pool. <br />d <br />(1) TITLE AND LOCATION (City and State) <br />Venetian Pool Renovations, City of Coral Gables <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project includes various recent and ongoing restoration efforts on the property, including: existing conditions <br />assessments, surveys, historic materials cataloging, pool vessel repairs and repainting, restoration of historic floor <br />tile, terrazzo courtyard and historic water fountain restoration. Includes additional restoration assignments including <br />perimeter fence, stucco and wood door restoration. <br />e <br />(1) TITLE AND LOCATION (City and State) <br />Historical Collins Park & Rotunda Restoration <br />City of Miami Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (if applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project includes preservation of an historic Rotunda building and development of code violation remedies to <br />provide versatile community meeting and climate controlled performance space allowing for receptions or exhibits <br />during all seasons Project includes substantial roadway, sidewalk and drainage improvements/modifications. <br />Page 15 <br />Qualification Information
The URL can be used to link to this page
Your browser does not support the video tag.