My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M.C. Harry & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M.C. Harry & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:47:40 AM
Creation date
8/21/2020 11:47:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Lee Feinberg, LEED AP <br />13. ROLE IN THIS CONTRACT <br /> <br />Sr. Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />24 <br />b. WITH CURRENT FIRM <br />19 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Architectural Studies, University of <br />Illinois 1994 / Bachelor of Architecture, Florida Atlantic <br />University 2002 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />2009 - LEED AP <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Feinberg has over 15 years of experience with public and private sector projects including historic <br />preservation, adaptive re-use, libraries, educational facilities, transportation facilities, condominium, hotel <br />and apartment design, and food and beverage service design. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Fire Station #4 <br />City of Miami Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />2008 <br />The 9,100sf emergency response facility includes a 3-bay apparatus garage with an adjacent decontamination <br />room; an alarm room; a firefighter dayroom, dining room and kitchen; a fitness center; a dormitory <br />accommodating 12 emergency response staff; and a variety of support spaces. <br />b <br />(1) TITLE AND LOCATION (City and State) <br />Royal Oaks Park Master Plan and Community Center - Town of <br />Miami Lakes <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTIION (if applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />The $2.2mil facility is located in the heart of a residential community and offers 4 athletic fields for soccer and <br />football, open playfield areas, a tot lot/playground area, picnic pavilions, exercise/bike trail, and a concession stand. <br />The 8,700sf community center received LEED Gold Certification. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Vizcaya Museum and Gardens - Village Master Plan and Phase I <br />Implementation <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Vizcaya Museum & Gardens Trust commissioned MC Harry & Associates to collaborate with the professional <br />leadership of Vizcaya to develop an updated long term master plan for the Museum, with particular focus on a new <br />comprehensive development program for the historic 11 acre Farm Village. <br />d <br />(1) TITLE AND LOCATION (City and State) <br />Melreese Golf Training Center <br />City of Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />2013 <br />The facility has approximately 5000 square feet and will include a large assembly/classroom area three enclosed <br />bays facing the practice range, two offices, storage area, restrooms and a kitchenette and vending area. It also <br />has a pre-fabricated canopy over the existing practice range and connecting walkways to the new clubhouse and <br />parking lot <br /> <br />e <br />(1) TITLE AND LOCATION (City and State) <br />Collins Park Rotunda Renovations <br />City of Miami Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project includes the complete interior remodeling and exterior improvements of the existing 2,000 square foot <br />unoccupied Rotunda Building located in the northeast corner of Collins Park, southwest of the intersection of Collins <br />Avenue and 22nd Street. The project will also include the construction of a new, approximately 400 square foot <br />standalone <br />Page 16 <br />Qualification Information
The URL can be used to link to this page
Your browser does not support the video tag.