My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M.C. Harry & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M.C. Harry & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:47:40 AM
Creation date
8/21/2020 11:47:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Howard Ferguson <br />13. ROLE IN THIS CONTRACT <br /> <br />Sr. Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />5 <br />b. WITH CURRENT FIRM <br />4 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Architecture 1997, University of Technology, Jamaica <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Architect—Jamaica <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Ferguson has worked on institutional , commercial and residential projects of varied sizes, budgets and complexities. He is an <br />effective team player with experience across the project spectrum including programming, design development, documentation, <br />construction administration and project closeout. He focuses on teamwork, timeline and budget to create and complete projects <br />that far exceed the original expectations. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />FIU Mango Building 5th and 6th Floor Restrooms Renovation <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (if applicable) <br />2018 <br />The project ‘s architectural and engineering services was to improve the existing male and female restrooms on the 5th and <br />6th floors as well as two showers on the 6th floor of the Management and New Growth Opportunities (MANGO) building. <br />Scope of work includes addition of lavatories, change in finishes, addition of mirrors and replacement of toilet accessories in <br />the restrooms as well as the addition of light fixtures and improvement to floor drainage in the showers. <br />b <br />(1) TITLE AND LOCATION (City and State) <br />FIU MARC 3rd Floor Business Incubator <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTIION (if applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />The project was to provide Architectural services for renovating approximately 7,400sf of existing office space on the third floor <br />of the MARC Building. The work will involve selective demolition of existing interior partitions, floor finishes and ceilings . <br />Renovation to incorporate perimter offices and a centrally located open office environment to facilitate the meeting of small <br />and large groups. Spaces for a small meeting room, a training room/classroom, conference room and a break room are to be <br />incorporated in the new design. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />FIU Baseball Stadium Renovations <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (if applicable) <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />The project was to provide architectural services to alter and renovate approximately 4,200sf of ground floor space in the FI U <br />Baseball Stadium building. The spaces to be altered include Home Team Locker Room and adjoining restroom/shower as well <br />as the existing men's public restroom and the area immediately east of the existing women's restroom. This improvement is <br />phase one of a larger effort to upgrade the baseball stadium facilities to comparable standards with other top rated higher <br />educational baseball teams in the nation. Improvement will include expanding the existing Home Team Locker room to <br />accommodate 40 lockers, larger restroom with individual showers, a lounge with a possible study area, a break room and a <br />room to remove and store cleats. <br />d <br />(1) TITLE AND LOCATION (City and State) <br />FIU Room EC 3930 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (if applicable) <br />2018 <br />The project was to provide architectural services to design and produce construction drawings for the renovation of EC 3930 <br />on the third floor of the Engineering Center Building. The design created a state of the art conference room that would be <br />used to communicate with other organizations remotely and be a model high tech teaching and conferencing space on the <br />engineering campus. <br /> <br />e <br />(1) TITLE AND LOCATION (City and State) <br />MDC Koubek Center Renovations <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />This project improved the selected restorations/renovations at the Koubek Theater. These areas include the theater, <br />classroom, art space renovations and outdoor spaces. <br />Page 17 <br />Qualification Information
The URL can be used to link to this page
Your browser does not support the video tag.