E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Lisette Boosooboy, IIDA, LEED AP
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Interior Design 14. YEARS EXPERIENCE
<br />a. TOTAL
<br />14
<br />b. WITH CURRENT FIRM
<br />14
<br />15. FIRM NAME AND LOCATION (City and State)
<br />M.C. Harry & Associates, Inc. / Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Masters of Arts in Interior Architecture, 2013, FIU
<br />Bachelor of Science in Interior Design, 2005, FIU
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />DISCIPLINE)
<br />LEED accredited professional
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />IIDA Member, MDC Museum of Art + Design Paper Hearts Fundraiser Consultant, FIU Interior Architecture Advisory Board,
<br />FIU Interior Architecture Festival of the Trees Committee Chair, Vice-President IIDA FIU Chapter 2004-2005, Peer Educator
<br />and Program Coordinator of P.E.A.C.E. Organization, National Society of Collegiate Scholars
<br />19. RELEVANT PROJECTS
<br />a.
<br />1) TITLE AND LOCATION (City and State)
<br />InterAmerican Campus Building 6 Renovation, MDC
<br />Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (if
<br />applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design for a 488,000 square foot facility that includes approximately 240,000 net square feet of parking
<br />on four floors and approximately 230,000 net square feet of space on the ground floor, mezzanine, and tower
<br />floors. The Building 6 phase II renovation project will provide academic and support spaces on the ground level,
<br />mezzanine level and tower levels 5 through 7, as well as address the exterior façade of the parking garage. The
<br />project also includes a new exit stair tower and elevators. Project Cost $36,117,600
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida International University Parking Garage 6 Dan Marino
<br />Foundation Build Out Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (if
<br />applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design: Build out included a 3,550sf grey box located on the ground floor of Parking Garage 6 to suit program
<br />requirements of the Dan Marino Foundation. Included offices, and classrooms; all new floor, wall and ceiling
<br />treatments; state of the art audio-visual infrastructure; a series of acoustic control strategies including entry vestibules
<br />and treatment to minimize reverberation. Construction Cost: $532,500
<br />c.
<br />1) TITLE AND LOCATION (City and State)
<br />Wolfe University Center, FIU , Biscayne Bay Campus
<br />Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (if
<br />applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm
<br />Interior Design for a 12,775 sf renovation of the Student Center, a geographical and social focal point for the
<br />north campus. It is a place for students to congregate, socialize and take part in educational and recreational
<br />programs. Renovations included refinement to the layout, building expansion opportunities, improved building
<br />access and identity. Project cost $3, 500, 000
<br />d.
<br />1) TITLE AND LOCATION (City and State)
<br />City of Miami Dinner Key Marina Dockmaster Facility
<br />Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (if
<br />applicable)
<br />2017
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design for wet-slip marina with space for 582 boats. To stay in step with ever growing demand, the
<br />area recently underwent a massive renovation, including MC Harry’s newly constructed, 9,700sf
<br />Dockmaster Facility.
<br />e
<br />1) TITLE AND LOCATION (City and State)
<br />City of Miami First Tee Golf Training Facility
<br />Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (if
<br />applicable)
<br />2013
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm
<br />Interior Design for the 5,000 First Tee Golf Training Facility at City of Miami’s Melreese Golf Course
<br />features a two story reception area; a large assembly space and classroom for group instruction; two
<br />administrative offices; an equipment storage area; restrooms and a small food and beverage concessions
<br />space.
<br />Page 19
<br />Qualification Information
|