Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Lisette Boosooboy, IIDA, LEED AP <br /> <br />13. ROLE IN THIS CONTRACT <br />Interior Design 14. YEARS EXPERIENCE <br />a. TOTAL <br />14 <br />b. WITH CURRENT FIRM <br />14 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Masters of Arts in Interior Architecture, 2013, FIU <br />Bachelor of Science in Interior Design, 2005, FIU <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />LEED accredited professional <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />IIDA Member, MDC Museum of Art + Design Paper Hearts Fundraiser Consultant, FIU Interior Architecture Advisory Board, <br />FIU Interior Architecture Festival of the Trees Committee Chair, Vice-President IIDA FIU Chapter 2004-2005, Peer Educator <br />and Program Coordinator of P.E.A.C.E. Organization, National Society of Collegiate Scholars <br />19. RELEVANT PROJECTS <br />a. <br />1) TITLE AND LOCATION (City and State) <br />InterAmerican Campus Building 6 Renovation, MDC <br />Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (if <br />applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design for a 488,000 square foot facility that includes approximately 240,000 net square feet of parking <br />on four floors and approximately 230,000 net square feet of space on the ground floor, mezzanine, and tower <br />floors. The Building 6 phase II renovation project will provide academic and support spaces on the ground level, <br />mezzanine level and tower levels 5 through 7, as well as address the exterior façade of the parking garage. The <br />project also includes a new exit stair tower and elevators. Project Cost $36,117,600 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Florida International University Parking Garage 6 Dan Marino <br />Foundation Build Out Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if <br />applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design: Build out included a 3,550sf grey box located on the ground floor of Parking Garage 6 to suit program <br />requirements of the Dan Marino Foundation. Included offices, and classrooms; all new floor, wall and ceiling <br />treatments; state of the art audio-visual infrastructure; a series of acoustic control strategies including entry vestibules <br />and treatment to minimize reverberation. Construction Cost: $532,500 <br />c. <br />1) TITLE AND LOCATION (City and State) <br />Wolfe University Center, FIU , Biscayne Bay Campus <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (if <br />applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Interior Design for a 12,775 sf renovation of the Student Center, a geographical and social focal point for the <br />north campus. It is a place for students to congregate, socialize and take part in educational and recreational <br />programs. Renovations included refinement to the layout, building expansion opportunities, improved building <br />access and identity. Project cost $3, 500, 000 <br />d. <br />1) TITLE AND LOCATION (City and State) <br />City of Miami Dinner Key Marina Dockmaster Facility <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (if <br />applicable) <br />2017 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design for wet-slip marina with space for 582 boats. To stay in step with ever growing demand, the <br />area recently underwent a massive renovation, including MC Harry’s newly constructed, 9,700sf <br />Dockmaster Facility. <br />e <br />1) TITLE AND LOCATION (City and State) <br />City of Miami First Tee Golf Training Facility <br />Miami, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if <br />applicable) <br />2013 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Interior Design for the 5,000 First Tee Golf Training Facility at City of Miami’s Melreese Golf Course <br />features a two story reception area; a large assembly space and classroom for group instruction; two <br />administrative offices; an equipment storage area; restrooms and a small food and beverage concessions <br />space. <br />Page 19 <br />Qualification Information