E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Midori Shim, IIDA, LEED AP
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Interior Design
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />4
<br />b. WITH CURRENT FIRM
<br />2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />M.C. Harry & Associates, Inc. / Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Masters of Interior Architecture, Florida International University, 2017
<br />Associates of Interior Design, Miami Dade College, 2014
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />IIDA Associate, LEED Green Associate
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Shim has over 3 years of professional experience. She has spent the last year as MCHarry Associates’ associate
<br />interior designer for miscellaneous projects. She has been responsible for interior design, finishes selection, contract
<br />documentation and construction administration for numerous renovation / expansion / repair projects for public and
<br />educational sector projects.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Atlantic Sapphire Salmon Farm
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />On-Going
<br />CONSTRUCTION (if applicable)
<br />On-Going
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design for a large pre-engineered metal facility in Homestead, Florida, that will expand over 40 acres of
<br />vacant land to enclose various large fresh and salt water systems that will be used to grow and harvest Atlantic
<br />Salmon. MC Harry provided design work, space planning, collaborate with furniture vendors and fabricators,
<br />specified interior finishes, coordinating and integrating various design and construction teams each assigned
<br />various components of the overall design.
<br />b
<br />(1) TITLE AND LOCATION (City and State)
<br />Larry and Penny Thompson Memorial Park, RV Campground -
<br />Miami, Florida / Miami Dade Parks & Recreation
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />On-Going
<br />CONSTRUCTIION (if applicable)
<br />On-Going
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design for an existing 270 acres which houses natural South Florida woodland, bridle trails, hiking paths,
<br />240 separate campsites and individual facilities. MC Harry addressed renovations and modifications of structural
<br />components and selection of new finishes, color palette, and restroom accessories to the four large restroom/
<br />laundry facilities.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />UF Field Research Lab - Homestead, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />On-Going
<br />CONSTRUCTION (if applicable)
<br />On-Going
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm
<br />Interior Design for a new research facility of 1,200sf CMU structure per applicable governing building, mechanical,
<br />electrical, plumbing and fire prevention codes. Building will be designed to satisfy the user’s requirements with
<br />infrastructure to properly house equipment. Coordinated colors and finishes
<br />d
<br />(1) TITLE AND LOCATION (City and State)
<br />SBBC Miramar High School - Broward , Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />On-Going
<br />CONSTRUCTION (if applicable)
<br />On-Going
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design services to make the facility meet the approved district educational facility plan SMART program.
<br />This consisted of being responsible for the full design of the complete replacement of the fire alarm system,
<br />electrical and HVAC systems, re-roofing of multiple buildings and selecting the new finishes, color palette, and
<br />furniture coordination of the Music lab, the STEM lab and Media Center improvements.
<br />e
<br />1) TITLE AND LOCATION (City and State)
<br />FIU at I-75, Public Policy Administration RM 339 - Miramar,
<br />Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />On-Going
<br />CONSTRUCTION (if applicable)
<br />On-Going
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Interior Design for a joint-use facility which holds an existing unoccupied space of approximately 900sf
<br />compromised of a reception area, a break space, four workstations, three offices, a storage space and a break
<br />space. Worked with end-users to establish crucial needs and subsequently developing the interior architecture and
<br />space planning.
<br />Page 20
<br />Qualification Information
|