Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Midori Shim, IIDA, LEED AP <br />13. ROLE IN THIS CONTRACT <br /> <br />Interior Design <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />4 <br />b. WITH CURRENT FIRM <br />2 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Masters of Interior Architecture, Florida International University, 2017 <br />Associates of Interior Design, Miami Dade College, 2014 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />IIDA Associate, LEED Green Associate <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ms. Shim has over 3 years of professional experience. She has spent the last year as MCHarry Associates’ associate <br />interior designer for miscellaneous projects. She has been responsible for interior design, finishes selection, contract <br />documentation and construction administration for numerous renovation / expansion / repair projects for public and <br />educational sector projects. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Atlantic Sapphire Salmon Farm <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design for a large pre-engineered metal facility in Homestead, Florida, that will expand over 40 acres of <br />vacant land to enclose various large fresh and salt water systems that will be used to grow and harvest Atlantic <br />Salmon. MC Harry provided design work, space planning, collaborate with furniture vendors and fabricators, <br />specified interior finishes, coordinating and integrating various design and construction teams each assigned <br />various components of the overall design. <br />b <br />(1) TITLE AND LOCATION (City and State) <br />Larry and Penny Thompson Memorial Park, RV Campground - <br />Miami, Florida / Miami Dade Parks & Recreation <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTIION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design for an existing 270 acres which houses natural South Florida woodland, bridle trails, hiking paths, <br />240 separate campsites and individual facilities. MC Harry addressed renovations and modifications of structural <br />components and selection of new finishes, color palette, and restroom accessories to the four large restroom/ <br />laundry facilities. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />UF Field Research Lab - Homestead, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Interior Design for a new research facility of 1,200sf CMU structure per applicable governing building, mechanical, <br />electrical, plumbing and fire prevention codes. Building will be designed to satisfy the user’s requirements with <br />infrastructure to properly house equipment. Coordinated colors and finishes <br />d <br />(1) TITLE AND LOCATION (City and State) <br />SBBC Miramar High School - Broward , Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design services to make the facility meet the approved district educational facility plan SMART program. <br />This consisted of being responsible for the full design of the complete replacement of the fire alarm system, <br />electrical and HVAC systems, re-roofing of multiple buildings and selecting the new finishes, color palette, and <br />furniture coordination of the Music lab, the STEM lab and Media Center improvements. <br />e <br />1) TITLE AND LOCATION (City and State) <br />FIU at I-75, Public Policy Administration RM 339 - Miramar, <br />Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Interior Design for a joint-use facility which holds an existing unoccupied space of approximately 900sf <br />compromised of a reception area, a break space, four workstations, three offices, a storage space and a break <br />space. Worked with end-users to establish crucial needs and subsequently developing the interior architecture and <br />space planning. <br />Page 20 <br />Qualification Information