Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Hermes Perez <br />13. ROLE IN THIS CONTRACT <br /> <br />Asst. Production <br />Manager/3D <br />Visualization <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />1 <br />b. WITH CURRENT FIRM <br />1 <br />15. FIRM NAME AND LOCATION (City and State) <br />M.C. Harry & Associates, Inc. / Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> Masters of Architecture, Florida International University, 2019 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Perez has over 1 year of professional architectural experience and over 2 years in the construction industry. He <br />has spent the last year at MCHarry Associates’ as an associate architecture designer for miscellaneous projects. He <br />has been responsible for design, field and contract documentation, construction administration for numerous <br />renovation / expansion / repair projects for public and educational sector projects. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />FIU ICTB Kampong <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />This project is the development of a new academic and research Center for FIU on a site adjacent to “The <br />Kampong” – a National Register of Historic Places listed site that was the home of David Fairchild. ICTB is a plant <br />research facility that will mainly be inhabited by college graduates and FIU staff aside from the occasional tour <br />group. <br /> <br /> <br />b <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade Parks & Recreation - Southridge Park Community <br />and Aquatic Center <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTIION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Planning and Design services for a 15,000sf facility with a large two story colonnade defining primary circulation <br />through the complex and linking the community center multipurpose rooms and fitness center with a splash pad and 8 <br />lane competition swimming pool. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Vizcaya Museum and Gardens - Village Master Plan and Phase I <br />Implementation <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √ Check if project performed with current firm <br />Vizcaya Museum & Gardens Trust commissioned MC Harry & Associates to collaborate with the professional <br />leadership of Vizcaya to develop an updated long term master plan for the Museum, with particular focus on a new <br />comprehensive development program for the historic 11 acre Farm Village. <br />d <br />(1) TITLE AND LOCATION (City and State) <br />SBBC Miramar High School - Broward , Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Design services to make the facility meet the approved district educational facility plan SMART program. This <br />consisted of being responsible for the full design of the complete replacement of the fire alarm system, electrical <br />and HVAC systems, re-roofing of multiple buildings and selecting the new finishes, color palette, and furniture <br />coordination of the Music lab, the STEM lab and Media Center improvements. <br />e <br />1) TITLE AND LOCATION (City and State) <br />Collins Park Rotunda Renovations <br />City of Miami Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (if applicable) <br />On-Going <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project includes the complete interior remodeling and exterior improvements of the existing 2,000 square foot <br />unoccupied Rotunda Building located in the northeast corner of Collins Park, southwest of the intersection of Collins <br />Avenue and 22nd Street. The project will also include the construction of a new, approximately 400 square foot <br />standalone <br />Page 21 <br />Qualification Information