Laserfiche WebLink
Page 23 <br />Qualification Information <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, Florida <br />(3) ROLE <br /> <br />Prime Consultant & Architect of Record <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />M.C. Harry & Associates, Inc. <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br />Architectural Continuing Services <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013-2020 <br />CONSTRUCTION (if applicable) <br />2013-2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Florida International University <br />b. POINT OF CONTACT NAME <br />Patty Ruiz <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 348-4064 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> M.C. Harry was selected to provide professional Architectural Consulting <br />services to Florida International University for various projects with a con- <br />struction value under $2million. <br />FIU MMC MARC 3rd Floor Business Incubator: <br />Renovate approximately 7,400sf of existing office space on the third floor of <br />the MARC Building. The work involved selective demolition of existing inte- <br />rior partitions, floor finishes and ceilings. Renovation to incorporate se- <br />lected existing perimeter offices while creating a mostly open office environ- <br />ment to facilitate the meeting of small and large groups. Spaces for a small <br />meeting room, a training room/classroom, conference room and a break <br />room were incorporated in the new design. The design will include limited <br />modification to the existing mechanical, electrical, plumbing and fire protec- <br />tion systems to accommodate the new layout. <br />Construction Cost $927,989 Completion 12/2017 <br /> <br />FIU Parking Garage 6 Dan Marino Foundation Build Out: <br />The project centered on creating a learning environment for autistic indi- <br />viduals transitioning from high school to college and working environments. <br />The build out included a 3,550sf grey box located on the ground floor of <br />Parking Garage 6 to suit program requirements of the Dan Marino Founda- <br />tion. Included offices, and classrooms; all new floor, wall and ceiling treat- <br />ments; state of the art audio-visual infrastructure; a series of acoustic con- <br />trol strategies including entry vestibules and treatment to minimize rever- <br />beration. <br />Construction Cost $532,500 Completion 10/2017 <br /> <br /> <br />FIU Carnival Student Center: <br />The 3,000sf space was renovated and repurposed to create an informal <br />attractive gathering place for students. With its multi -purpose use and re- <br />source center, the Carnival Student Center has become an activity hub <br />where students meet, hold casual get-togethers and student organization <br />meetings, work on group projects, and create class presentations in the <br />adjacent computer center. Industry representatives scouting prospective <br />interns and employees conduct interviews in a fully equipped conference <br />room. Among the facility’s features is an advising center, a reading room, <br />computer workstations and a fully equipped kitchenette. <br />Construction Cost $414,636 Completion 2/2011 <br />ARCHITECT