My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M.C. Harry & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M.C. Harry & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:47:40 AM
Creation date
8/21/2020 11:47:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 26 <br />Qualification Information <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, Florida <br />(3) ROLE <br /> <br />Prime Consultant & Architect of Record <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />M.C. Harry & Associates, Inc. <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />5 <br />21. TITLE AND LOCATION (City and State) <br />A/E Planning and Design Services 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-2020 CONSTRUCTION (if applicable) <br />2017-2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Miami Lakes, Florida <br />b. POINT OF CONTACT NAME <br />Tony Lopez <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 364-6100 Ext 1130 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />A/E for various park improvements, master plans, and design criteria <br />professional services: (2017—Current) <br /> <br />Loch Ness Park Optimist Park Master plan <br />Florida Pocket Park Optimist Park Boundless Playground <br />Picnic Park East / Skate Park Town Hall Design Criteria Professional <br /> <br />Royal Oaks Community Center 2010: <br />The Royal Oaks Community Center not only completes the park but also <br />initiates the Town’s aggressive investment in sustainable design for all of <br />their municipal projects. As a result, MC Harry Associates delivered the <br />first municipal project in South Florida to achieve LEED Gold <br />Certification. Contributing to this achievement is an annual water savings <br />of 53%; and a 19% annual energy savings. <br /> <br />The Community Center’s design expression reflects the neo- <br />Mediterranean architecture of the surrounding residential neighborhood. <br />The 8,700sf floor plan is organized around a linear pre-function lobby <br />space flanked by a large multipurpose assembly space on one side, and <br />a variety of administrative offices, toilet facilities, and storage spaces on <br />the other. Construction Cost: $2.1M <br />ARCHITECT
The URL can be used to link to this page
Your browser does not support the video tag.