Laserfiche WebLink
<br /> <br />RELEVANT EXPERIENCE <br /> <br />Project Name: Flagler Countyline Corporate <br />Park <br /> <br />Client’s Name: Flagler Global Logistics <br />3200 NW 67th Ave., Bldg 1, Ste <br />150, Miami, FL 33122 <br />Jose Gonzalez, VP <br />305-520-2372 <br />Fax 305-520-2364 <br />Jose.gonzalez@flaglerdev.com <br /> <br />Type of Facility or <br />Services: <br />Land Development <br />SRS Project Fees: <br />Construction Costs: <br /> <br />$526,460 <br />$28,200,000 (Est.) <br /> <br />Project Dates: 02/2017 <br /> <br />Key Individuals <br />Involved: <br />Ignacio Serralta, P.E. <br />Jean-Claude Fontaneau, E.I. <br /> <br />Project Description: <br /> <br />Flagler Countyline is a Commercial/Industrial land <br />development consisting of 504 Acres and approximately 8.3 <br />million square feet of warehouse/office buildings located within <br />the City of Hialeah annex area. SRS services included <br />assisting in the site plan development and the civil design of <br />all on-site roadways, paving and grading, drainage and storm <br />water management systems, water and sewer systems, and a <br />sewer pump station. Services also included design of roadway <br />improvements along adjacent portions of NW 97th Avenue, <br />NW 102nd Avenue, NW 158th Street and NW 162nd Street. <br />Other services included contracting and coordinating all <br />geotechnical investigations; all environmental studies <br />including wetland mitigation reports and preparation of ERP <br />permit. Phase I of the overall development plan is <br />approximately 160 Acres and is a portion of a previously <br />permitted construction and demolition material landfill site. <br /> <br />SRS was responsible for the preparation of civil engineering <br />design plans and specifications for the site paving, gr ading, <br />and drainage, as well as, site infrastructure necessary for the <br />construction of approximately 2.3 million square feet of <br />industrial buildings for Phase I alone. The sewer design <br />comprised of approximately 2,600 LF of 8-inch sanitary sewer <br />force main, over 15,000 LF of 8-inch gravity sewer mains, and <br />the design and permitting of a City of Hialeah sewer pump <br />station to provide service for the 160 Acres. The proposed <br />force main will connect to the existing 24” sanitary sewer force <br />main along NW 97th Avenue. <br /> <br /> <br /> <br />95