My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />RELEVANT EXPERIENCE <br /> <br /> <br />Project Name: City of Miami Continuing Services <br />Contract – NE 2nd Avenue <br />Improvements from NE 42nd <br />Street to NE 51st Street, Miami, <br />FL <br /> <br />Client’s Name: City of Miami, CIP <br />444 SW 2nd Avenue, 8th Floor <br />Miami, FL 33130 <br />Keith A. NG, CFM <br />305-416-1298 <br />Fax 305-416-1995 <br />keithng@miamigov.com <br /> <br /> <br />Type of Facility or <br />Services: <br />City of Miami Roadway Drainage <br />Improvements <br /> <br />SRS Project Fees: <br /> <br />$161,923.51 <br /> <br />Project Dates: 12/2015 <br />Key Individuals <br />Involved: <br />Ignacio Serralta, P.E. <br />Oliverio Sanchez, P.E. <br />Jean-Claude Fontaneau, EI <br /> <br />Project Description: <br /> <br />Services encompassed professional civil engineering services <br />and project management for the design and preparation of <br />complete construction documents for the roadway, sidewalk <br />reconstruction, drainage, street lighting, signalization, and <br />landscaping improvements along NE 2nd Avenue from NE 42nd <br />Street to NE 51st Street. Services consist of the formulation of <br />all construction documents such as design drawings, <br />specifications, cost estimates, plans processing, permitting, <br />bid phase services and limited construction phase services as <br />needed. <br /> <br /> <br />92
The URL can be used to link to this page
Your browser does not support the video tag.