Laserfiche WebLink
<br /> <br />RELEVANT EXPERIENCE <br /> <br />Project Name: Ponce de Leon Blvd. CEI <br /> <br />Client’s Name: City of Coral Gables <br />Depart. of Public Works <br />Mr. Ernesto Pino, RA <br />(305) 460-5004 <br />Fax (305) 460-5026 <br />epino@coralgables.com <br /> <br /> <br />Type of Facility or <br />Services: <br />Construction Inspection Services <br /> <br />SRS Project Fees: <br />Construction Costs: <br /> <br />$ 194,663.53 <br />$1,816,772.42 <br />Project Dates: 01/05/2012 <br />Key Individuals <br />Involved: <br />Ignacio Serralta, P.E. <br />Oliverio Sanchez, P.E. <br />Ralph Pereda <br />Luis Hurtado <br /> <br />Project Description: <br />Construction administration support and inspection services <br />during the construction of Ponce de Leon Boulevard Median <br />Beautification project as required by the Department to meet <br />FDOT’s LAP Program requirements. Scope of Work included, but <br />not limited to, the following: <br /> <br />• Provide CEI and construction administration services as required <br />for the LAP Program. <br />• Attend pre-construction meeting and prepare minutes for <br />distribution. <br />• Review shop drawings submitted by Contractor for adherence to <br />construction documents. <br />• Attend bi-weekly progress meetings and prepare for minutes for <br />distribution. <br />• Respond to Contractor request for information and clarification of <br />contract documents. <br />• Coordinate utility issues/conflicts. <br />• Process all construction correspondence and documents. <br />• Review and recommend Contractor payment requisitions. <br />• Review Contractor’s certified payrolls. <br />• Conduct labor interviews to assure wage rate compliance. <br />• Verify Contractor’s Disadvantaged Business Enterprise (DBE) on- <br />going training program. <br />• Review Contractor EEO requirements. <br />• Provide on the Job Training (OJT) monitoring and reporting. <br />• Review and recommend Contractor change order requests, if any. <br />• Provide full-time inspector (40 hours per week). <br />• Conduct semi-final inspection and prepare punch list. <br />• Conduct final inspection, punch list, and contract close-out. <br />• QA/QC – limited materials and density testing Provide independent <br />assurance testing and coordinate with testing lab to obtain sampling <br />and testing. Compare test results and document in project records. <br />• Provide photo history of project in digital format. <br /> <br /> <br />93