My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
burtonhersh <br />A R C H I T E C T U R E I P L A N N I N G <br /> <br />Burton Hersh, PA I 130 Miracle Mile #200 I Coral Gables, Fl 33134 I T 305.446.4877 I AA 26001651 I www.burtonhersh.com <br /> <br />January 8, 2014 <br />Messrs Robert G. Berrin and Isaac K. Fisher <br />Capital Realty Services, Inc. <br />4601 Ponce de Leon Boulevard <br />Suite 300 <br />Coral Gables, Florida 33146 <br /> <br />Via: Email: rberrin@capital-realty.com and ike@capital-realty.com <br /> <br />Re: 9700 South Dixie Highway – Lobby at Dadeland Executive Center <br /> <br />Dear Mr. Berrin and Fisher: <br /> <br />This document shall constitute the agreement between Owner and Architect by and between Capital Realty Services, Inc, <br />hereinafter referred to as “Owner” and Burton Hersh, PA, hereinafter referred to as “BHPA. <br /> <br />I. The Project: A lobby at 9700 South Dixie Highway as described in the Design Drawings revised on November 27, 2013. <br /> <br />II. The Program: <br /> <br />1. The program is set forth in the Design Drawings. The scope of the work includes reconfiguration of the elevator shaft as <br />well as both interior and exterior of the Lobby. <br /> <br />III. Basic Services: <br /> <br />A. Construction Documents Phase: <br />1. Based on the Design Drawings BHPA shall prepare, for approval by the Owner, Construction Documents <br />consisting of drawings with specifications setting forth in detail the architectural, electrical engineering, plumbing <br />engineering, mechanical engineering, fire protection and fire alarm requirements for construction of the Project. <br /> <br />B. Bidding and Permitting Phase: <br />1. BHPA shall provide 2 sets of signed and sealed Construction Documents to the Owners permit processor for <br />submission to the authorities having jurisdiction over the project for the issuance of a building permit. <br />2. BHPA shall respond to Requests for Information from bidders from the Owner’s Contractor. <br />3. BHPA shall assist the Owner’s permit processor with the permitting process by responding to comments from <br />the governing municipality and making adjustments required by them for compliance with the governing building <br />codes. <br /> <br />D. Construction Phase: <br />1. BHPA shall respond to Requests for Information from the Contractor and issue Supplemental Instructions to the <br />Contractor as necessary. <br />2. BHPA will review and approve, or take other appropriate action upon the contractor’s submittals, including but <br />not limited to Shop Drawings, Product Data and Samples for the purpose of checking for conformance to the <br />Contract Documents. <br />IV. Additional Services: <br /> <br />A. The services described in this Paragraph are not included in Basic Services, and they shall be paid for by the Owner as <br />provided in this Agreement, in addition to the compensation for Basic Services. However, BHPA shall notify the Owner <br />prior to commencing such services. If the Owner deems that such services described below are not required, the <br />Owner shall give prompt written notice to BHPA. If the Owner indicates in writing that all or part of such Additional <br />Services are not required, BHPA shall have no obligation to provide those:
The URL can be used to link to this page
Your browser does not support the video tag.