My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18800 NW 2nd Ave, Suite 216, Miami, Florida 33169 (305) 651-8522 www.hammondengineers.com <br />SAMPLE PROJECTS <br />DORAL MEADOWS PARK, CITY OF DORAL, FL <br />Project Description: <br />Provided electrical drawings for parking lot lighting, soccer field, baseball fields. <br />Designed stub outs for future buildings. Provided signed and sealed plans, <br />permitting services, bidding services and construction administration through <br />final project completion. <br />Construction Cost: $2M <br />Contract Duration: 2002 <br />Prime/Sub-Consultant: Sub-consultant <br />Results: Completed per Contract Documents <br />Relevant to scope: 3.1.1 Street Lighting, 3.1.7 New Construction, <br /> 3.1.8 Permitting <br />SOUTH FLORIDA REGIONAL TRANSIT AUTHORITY, POMPANO <br />BEACH, FL <br />Client: PGAL, Inc. <br />Project Description: <br />SFRTA Operations Center is a 75,000 sq. ft. facility that consists of a <br />3-story office building, including a 150 seat boardroom, a customer service <br />and dispatch operations center, and loading and receiving areas. The <br />new site includes a 4-level parking garage which houses approximately <br />400 parking spaces and supports both the Operations Center and <br />parking for Tri-Rail passengers. The project is designed to the LEED <br />Gold standard. Hammond & Associates delivered Mechanical, Electrical, <br />Plumbing, Fire Protection, LEED Certified Gold <br />Construction Cost: $40 M <br />Contract Duration: Completed 2016 <br />Prime/Sub-Consultant: Sub-consultant <br />Results: Completed per Contract Documents <br />Relevant to scope: 3.1.1 Street Lighting, 3.1.7 New Construction, 3.1.8 <br />Permitting, 3.1.16 Design of Parking Structures <br />MIRAMAR MULTI-CENTER COMPLEX, MIRAMAR, FL <br />Client: PGAL, Inc. <br />Project Description: <br />New construction 38,000 SF state of the art senior center/community center. <br />Environmentally responsible facility that includes classrooms, card and game <br />rooms, and multipurpose community meeting rooms provide educational, <br />recreational, and social opportunities. Hammond & Associates delivered the <br />Mechanical, Electrical, Plumbing, & Fire Protection design. <br />Construction Cost: $14 M <br />Contract Duration: 2006 to 2008 <br />Prime/Sub-Consultant: Subconsultant <br />Results: Completed per Contract Documents <br />Relevant to scope: 3.1.7 New Construction, 3.1.8 Permitting,
The URL can be used to link to this page
Your browser does not support the video tag.