Laserfiche WebLink
PROJECT DESCRIPTION: <br />This facility is a three story wrap around structure surrounding the <br />Town Center Parking Garage. The first level of this 80,000 SF building <br />consists of a pedestrian friendly retail area with an arch covered <br />exterior sidewalk facing City Hall Promenade and the pedestrian/ <br />automobile entrance to the building. The second and third floor houses <br />the City’s Police Department including a sally port entry, holding areas, <br />offices,conference rooms and investigative facilities. This secure <br />building is designed to be bullet-proof inside and outside and withstand <br />Category 5 hurricanes. <br />PROJECT RELEVANCY: <br />3.1.7 New Construction, 3.1.8 Plans Review and Permitting, 3.1.10 Contract <br />Administration,3.1.13 Project Manager <br />CLIENT: <br />Cartaya Architects, Inc. <br />TOTAL DOLLAR VALUE: <br />Construction Cost: $23 M <br />CONTRACT DURATION: <br />2015 to 2017 <br />REFERENCE: <br />Juan Justiniano <br />954.776-2724 <br />jJustiniano@cartayaand <br />associates.com <br />COMPANY ROLE: <br />Sub-Consultant <br />SCOPE: <br />Plumbing <br />Fire Protection <br />Construction Administration <br />CITY OF MIRAMAR POLICE DEPARTMENT, <br />CITY OF MIRAMAR, FL <br />18800 NW 2nd Ave, Suite 216, Miami, Florida 33169 (305) 651-8522 www.hammondengineers.com