Laserfiche WebLink
ERIC J. HAMMOND, PE <br />PRINCIPAL/MECHANICAL ENGINEER <br />EDUCATION: <br />Bachelor of Science, Mechanical <br />Engineering, University of the <br />West Indies, 1973 <br />Diploma, Electrical Engineering, <br />University of Technology, 1967 <br />REGISTRATION/LICENSES: <br />Florida Professional Engineer <br />PE39008 <br />AFFILIATION: <br />National Fire Protection <br />Association <br />YEARS WITH THE FIRM: <br />32 <br />Mr. Eric J. Hammond, PE is a Professional Engineer with over 45 years of experience in <br />Mechanical,Plumbing and Fire Protection design and Construction, Management. Mr. <br />Hammond is the Principal-in-Charge overseeing all technical and administrative policies <br />and management of the firm. He has facilitated many new and existing municipal <br />projects, to include public safety and transportation, judicial buildings, fire stations, <br />parking garages, emergency operations, community enters, senior centers, recreational <br />centers, parks, and renovation and remodeling of building facilities. He makes ethical and <br />cost efficient decisions that result in exceptional client satisfaction. He attends meetings <br />during the design phase and remains active in all projects throughout completion. <br />He performs necessary code research within his discipline and collaborates with the <br />Architect and project Owner. <br />MIAMI-DADE COUNTY Information Technology Department (ITD), Miami, FL – The <br />Miami Dade Information Technology Building required replacement of all of their HVAC Air <br />Handling Units. The scope of work was delivered in two 2 phases: Phase 1 included the <br />replacement of all the Chilled Water Air handling units located in the 3rd floor Mechanical <br />room. These AC units served all 3 floors in the building. Phase 2 included the replacement <br />of all the VAV’s on the 1st, 2nd, and 3rd floors. Provided Mechanical and Electrical <br />design services as well as Construction Administration for this project. Role: Principal/ <br />Mechanical Engineer <br />FIRE STATION NO. 62, Miami, FL – This new, state-of-the art 11,000-square foot fire <br />station is LEED certified. This environmentally-friendly building is highly energy efficient <br />as it utilizes solar power to heat water for the station. Station #62 was built to preserve <br />valuable flora and fauna as it maintains the remnant forest on the front of the lot. The <br />building of the station was funded from Fire District Impact Fees and houses an advanced <br />life support engine with four uniformed personnel 24/7 . Hammond & Associates provided <br />Mechanical, Electrical, Plumbing , and Low Voltage Design Services. Role : Principal/ <br />Mechanical Engineer <br />FORT LAUDERDALE FIRE STATION NO. 54, Broward County, FL – This 10,000 <br />SF facility includes a two-bay apparatus room for a ladder and rescue trucks, a medical <br />exam/watch office, two business offices, equipment bunker storage, medical storage, <br />decontamination room and a multi-purpose room for department or community use <br />complete with restroom facilities. The site also includes a training tower for live drills. <br />Living amenities within the two-story building include private dormitory facilities, full- <br />service kitchen with commercial range and hood, dining facility, day room with reclining <br />theater seats, covered exterior patio, laundry, and fitness facility. Sustainable building <br />design and construction practices were planned into the building and site design to attain <br />Florida Green Building Coalition Certification. Role: Principal/Mechanical Engineer <br />BROWARD COUNTY COURTHOUSE, Broward County, FL – Hammond & <br />Associates provided Mechanical, Electrical, Plumbing Engineering services for the new <br />courthouse complex includes a county office building, the county jail, three courthouse <br />buildings, an energy center, and a parking garage. The 740,000-square foot court building, <br />which will occupy a 1.55-acre portion of the campus, is 20-stories high and features 74 <br />courtrooms and hearing rooms, as well as office space for several government agencies. <br />The courthouse will feature state-of-the-art technology, including extensive audio-visual <br />and evidence presentation systems for the courtrooms and office spaces. Security will be <br />enhanced using CCTV, card access, duress devices (push buttons) and entry screening <br />security systems. Achieving a LEED Gold certification, the courthouse includes energy <br />reductions up to 22 percent and water-use savings up to 30 percent. Role: Principal/ <br />Mechanical Engineer <br />CITY OF MIRAMAR POLICE DEPARTMENT, City of Miramar, FL– This new facility <br />is a three-story wrap around structure surrounding the Town Center Parking Garage. The <br />second and third floor houses the City’s Police Department including a sally port entry, <br />holding areas, offices, conference rooms and investigative facilities. This secure building <br />is designed to be bullet-proof inside and outside and withstand Category 5 hurricanes. <br />Hammond & Associates provided Plumbing and Fire Protection for the project. Role: <br />Principal | Mechanical Engineer <br />RELEVANT PROJECT EXPERIENCE <br />18800 NW 2nd Ave, Suite 216, Miami, Florida 33169 (305) 651-8522 www.hammondengineers.com