Laserfiche WebLink
120 <br /> <br /> <br /> <br /> <br /> <br />OWNER <br />Oleta Partners LLC <br /> <br />CLIENT CONTACT <br />Oleta Patners, LLC <br /> <br />Darryl Lee, P.E., LEED AP <br />Development Project Manager <br />15045 Biscayne Boulevard <br />North Miami, FL 33181 <br />305-442-6531 <br /> <br />CONSTRUCTION COST <br />N/A <br /> <br />COMPLETION DATE <br />February 2013 <br />DESCRIPTION <br />Premiere Design Solutions, Inc. (PDS) served as the Surveyor and Engineering Consulting firm for this <br />project which included the filed data collection, computer drafting, digital terrain modeling (DTM), <br />topographic survey, volume calculations and report preparation including cross sections of crushed <br />concrete stock piles. <br />PDS was contracted to determine the volume of crushed concrete material stockpiled at the Biscayne <br />Landings construction site. The developer has hired a contractor tasked with crushing and stockpiling <br />crushed concrete for future fill operations on site. PDS coordinated in-house survey crew to obtain <br />horizontal and vertical data of the location and elevation of the stockpiled material. With the information <br />of the points collected in the field utilizing cross sections no longer than 25’, information was migrated <br />into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the <br />field, generating surfaces for the existing ground and for the surface area of each of the five stock pile <br />mounds located at the construction site. The DTM was used to determine the volume between the two <br />surfaces, and to generate cross sections of the stock piles at constant intervals. <br /> <br />A topographic survey was completed, incorporating the data collected in the field and data from the site <br />survey and a plan view drawing was generated. A volume calculation report was created with plan view, <br />cross sections and volume calculation data. Findings from our volume determination were used to <br />determine payment quantities and to determine production rate adequacy by the owner. It was found <br />that the Volume stock piled was considerably less than expected, so production of crushed concrete will <br />have to increase to reach projected targets. Our services saved allowed our client to perform this task <br />on budget and on schedule. This p roject was completed within the aggressive schedule required by the <br />owner. <br /> <br />Premiere Design Solution’s role in the project is: <br /> <br /> Conduct Field Data Collection and topographic Survey <br /> Develop a Digital Terrain Model of existing ground and crushed concrete surfaces <br /> Volume Calculations <br /> Volume Determination Report Preparation with Cross Sections for each Mound. <br /> <br />Biscayne Landing – Swerdlow Group <br />Crushed Concrete Volume Determination <br />North Miami, Florida <br /> <br />Previous ExperiencePremiere Design Solutions, Inc.