My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CE Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CE Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:21:20 AM
Creation date
8/24/2020 11:18:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br />City of Sunny Isles Beach Procurement/Contract No. 20-07-01 Project Approach and Understanding <br /> <br /> Coordinate with the City’s PM to assure that the Contractor is in full compliance with CQCP, all disposition of defective materials <br />is addressed, and Independent Assurance Reports are addressed/closed for project density books, embankment & earthwork, <br />asphalt roadway & plant, and concrete testing reports. <br /> Determine the acceptability of all materials and completed work items on the basis of test results, certifications, etc. and provide <br />the final Engineer’s Material Certification Statement. <br /> <br />Innovative concepts proposed to enhance value, quality, and to control cost and schedule: CE has developed our own Automatic <br />Utility Conflict Identification (AUCI) program, whose benefits are proudly offered to The City of Sunny Isles Beach. At times utilities <br />are seldom depicted on plan components which may lead to overlooking significant conflicts. By combining experience and contemporary <br />technology, we have developed a groundbreaking AUCI solution to these challenges. Designer CAD files are imported to Geographic <br />Information System (GIS), and the tools within the software used to highlight areas where construction overlaps utilities. The program <br />removes the challenges involved in the accurate and thorough identification of utility conflicts in construction plans as all 2-D potential <br />utility conflicts are quickly identified. Our Team will pay close attention to all locations where underground work is proposed (drainage, <br />lighting, irrigation, bus shelter footings) to identify any potential conflict with underground and/or overhead utilities. If a conflict is flagged <br />by the program, our Team will proactively discuss the findings with the Cities project personnel, and respective utility owners to find a <br />solution that will resolve the issue and mitigate any delay. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.