Pacifico Castillo, P.E.27+9Project Principle
<br />Castillo Engineering, Inc. - Miami, Florida
<br />Bachelor of Science Degree in Civil Engineering - Florida
<br />International University - July 1992
<br />Professional Engineer: Florida, 1998: (53145)
<br />State Certified General Contractor (CGC1510248)
<br />10-Hour OSHA Training Course Completion (Construction Safety and Health)
<br />CTQP Quality Control Manager
<br />FDOT Advanced MOT
<br />FDOT Critical Structures Construction Issues
<br />FDOT Auger Cast Pile Inspection
<br />FDOT MSE Wall Inspection
<br />Senior Construction Project Manager - Miami, Florida Project Management
<br />Widening of the Homestead Extension of Florida's Turnpike (HEFT) from Killian Parkway to Sunset Drive - Miami-Dade County: Construction Project Manager for the $73
<br />million Design/Build project called for the widening of the Florida's Turnpike from 6 to 10 lanes. In addition, the project also included the widening and reconstruction of 4
<br />miles of roadway, drainage and lighting improvements, MSE retaining walls and noise walls, Box Culvert extension. Responsibilities include verification and Quality Assurance
<br />through the supervision of the inspections performed on the bridge widening structural components in accordance with FDOT specifications and Contract documents. Other
<br />responsibilities include oversite of the construction contract administration, RFP and concept plans review for constructibility and risk assessment prior to and during
<br />procurement and during the design phase, coordinating with FDOT, CEI, and Contractor staff. Anticipated project completion in Winter 2020.
<br />Senior Construction Project Manager - Miami, Florida Project Management 2013-2017
<br />Widening of the Homestead Extension of Florida's Turnpike (HEFT) from SW 216th Street to Eureka Drive - Miami-Dade County: Construction Project Manager for the $41
<br />million Design/Bid/Build project called for the widening of the Florida's Turnpike from 6 to 10 lanes, replacement of the existing bridge over the C-1N Canal and the widening of
<br />the bridges over Caribbean Boulevard, US-1, Quail Roost and Eureka Drive. In addition, the project also included the widening and reconstruction of 3 miles of roadway,
<br />drainage and lighting improvements, MSE retaining walls and noise walls, Box Culvert extension. Responsibilities include verification and Quality Assurance through the
<br />supervision of the inspections performed on the bridge(s) structural components (pile foundations, bents, and decks) in accordance with FDOT specifications and Contract
<br />documents. Other responsibilities included oversite of the construction contract administration, design plan reviews, coordinating with FDOT, CEI, and Contractor staff.
<br />Senior Construction Project Manager - Ft. Lauderdale, Florida Project Management 2012-2013
<br />All Electronic Toll (AET) Conversion Phase SB Sawgrass Expressway - Broward County: Construction Project Manager on this $41 million Design/Build project called for the
<br />modification to the Sawgrass Expressway's Sunrise Boulevard and Deerfield Beach toll plazas and the seventeen ramp toll plazas. The All Electronic Toll (AET) conversion
<br />scope included demolition of existing toll plazas, grading and paving, signing and pavement marking, modifications to drainage, traffic signals, preservation of intelligent
<br />transportation system (ITS) and installation of new toll equipment structures. Improvements on this project also included the widening of the southbound Turnpike mainline exit
<br />ramp to westbound Sawgrass Expressway and the widening of the northbound exit ramp to Sunrise Boulevard.
<br />Senior Construction Project Manager - Ft. Lauderdale, Florida Project Management 2006-2012
<br />Senior Construction Project Manager - Ft. Lauderdale, Florida Project Management 2006-2011
<br />Widening of Florida's Turnpike from Sunrise Boulevard to Atlantic Boulevard - Broward County: Construction Project Manager on this $135 million project called for the
<br />widening of the Florida's Turnpike from 6 to 8 lanes, replacement of the existing bridges at Commercial Boulevard and the widening of the bridges at C-13 Canal, US 441
<br />(SR-7), and N.W. 31st Avenue (Lyons Road). In addition, the project also included the widening and reconstruction of 7 miles of mainline roadway, drainage and lighting
<br />improvements, retaining walls and noise walls, placement of over half a million cubic yards of embankment material and the reconstruction of the interchange at Commercial
<br />Boulevard. As part of the contract, the dedicated Sun Pass Lanes at the Cypress Creek Toll Plaza were converted to Open Road Tolling using the existing canopy structure
<br />and administration building.
<br />Widening of Florida's Turnpike from Griffin Road to Sunrise Boulevard - Broward County: Construction Project Manager on this $120 million project called for the widening of
<br />the Florida's Turnpike from 6 to 8 lanes, replacement of the existing bridge at Peters Road and the widening of the bridges at Griffin Road, I-595, Broward Boulevard and C-12
<br />Canal. In addition, the project also included the widening and reconstruction of 7 miles of mainline roadway, drainage and lighting improvements, the construction of a box
<br />culvert - 1 mile long, retaining walls and noise walls, placement of over half a million cubic yards of embankment material and the reconstruction of the ramps at Griffin Road,
<br />I-595 and Sunrise Boulevard.
|