SR 5/Biscayne Blvd from SE 3 AVE to N OF SE 2 ST & SE 2 AVE from SE 2 ST to SE 4 ST – FDOT District VI – Miami-Dade County. This $5 million project consisted of
<br />drainage improvement along Biscayne Blvd in downtown Miami, milling & resurfacing along SR 5 SE 2 Ave from SE 2 ST to SE 4 ST, flexible pavement reconstruction, rigid
<br />pavement construction, new mast arm installations,new light poles, and ADA improvements within the project limits. Responsibilities included supervising inspection staff in
<br />the application of Department Procedures and Standards, monitoring field testing and results, preparing Supplemental Agreements and Work Orders required for
<br />implementing contract changes, generating monthly estimates in Site Manager, preparing final estimate package, working with the Engineer of Record to coordinate design
<br />changes and plan revisions, reviewing the project monthly schedule updates and analyzing construction claims to determine entitlement.
<br />Andres Diaz, P.E.10+1Senior Project Engineer/Project Administrator
<br />Castillo Engineering, Inc. - Miami, Florida
<br />-Master of Science Degree in Civil Engineering -
<br />Florida International University – August 2013
<br />-Bachelor of Science Degree in Civil Engineering -
<br />Florida International University - December 2011
<br />Professional Engineer: Florida License No. 87323
<br />Award for "Excellence in Teamwork" (FDOT)
<br />Award for "Excellence in Customer Services" (FDOT)
<br />Member of American Society of Civil Engineers
<br />Member of Florida Engineering Society
<br />CTQP Final Estimate Level I & II
<br />CTQP Quality Control Manager
<br />ATSSA MOT Advanced
<br />Troxler Nuclear Gauge Safety
<br />CTQP Asphalt Paving Level I & II
<br />ACI Concrete Field Testing Technician Grade I
<br />FDOT Critical Structures Construction Issues
<br />CTQP FDOT Concrete Field Technician
<br />CTQP Drilled Shafts
<br />CTQP Earthwork Level I & II
<br />Senior Project Engineer. - Miramar, Florida
<br />Park and ride facility at Miramar Boulevard and Hiatus Road – District IV. The $8 million project consists of the construction of a new park and ride
<br />facility for the Broward County Mobility Program. This is an off-system project located in the City of Miramar, includes the construction of 488 parking
<br />spaces, surface water management system that include inlets, culverts, dry retention areas, infiltration trench, new pavement markings, new signage,
<br />landscaping, and lighting. In addition, the project will include the installation of a single mast arm and the construction of a turn lane on Pembroke Road
<br />that will serve as the entrance to the park and ride lot. Participating on project on a part time bases. Expected completion Spring 2022
<br />Project Administrator/Project Engineer. - Miami, Florida
<br />SR 25/US-27/Okeechobee rd from W OF SE 7 Ave to N OF NW 36 ST – FDOT District VI - Miami-Dade County. This $2.5 million project consisted of milling and
<br />resurfacing along SR 25, widening, new mast arm installations, new lighting, intersection improvements, new guardrail installation, and ADA improvements within the project
<br />limits. Responsibilities included supervising inspection staff in the application of Department Procedures and Standards, monitoring field testing and results, preparing
<br />Supplemental Agreements and Work Orders required for implementing contract changes, generating monthly estimates in Site Manager, preparing final estimate package,
<br />working with the Engineer of Record to coordinate design changes and plan revisions, reviewing the project monthly schedule updates and analyzing construction claims to
<br />determine entitlement.
<br />CEI Services
<br />CEI Services 2018-2019
<br />Project Administrator/Project Engineer. - Miami, Florida CEI Services 2017-2019
<br />Project Administrator/Project Engineer. - Miami, Florida
<br />SR 968/Flagler Street from 69 AVE to 27 AV – FDOT District VI – Miami-Dade County. This $5 million project consisted of milling and resurfacing of SR 968 from Tamiami
<br />Canal Rd to W 27 Ave, minor signalization and drainage improvements, and upgrading ADA features within the project limits. Responsibilities included supervising
<br />inspection staff in the application of Department Procedures and Standards, monitoring field testing and results, preparing Supplemental Agreements and Work Orders
<br />required for implementing contract changes, generating monthly estimates in Site Manager, preparing final estimate package, working with the Engineer of Record to
<br />coordinate design changes and plan revisions, reviewing the project monthly schedule updates and analyzing construction claims to determine entitlement.
<br />CEI Services 2017
<br />Project Administrator/Project Engineer. - Miami, Florida
<br />SR 90/SW 8 St from W OF SW 39 Ave to E OF SW 34 Ave & SR 90/SW 8 ST @ Le Jeune Road – District VI – Miami-Dade County. This $2.5 million project consisted of
<br />milling and resurfacing SR 90, four new mast arms at the intersection SW 8 St and Le Jeune Rd, widening of SW 8th Street from SW 34 35 Ave to SW 34 Ave, relocation of
<br />lighting along SW 8th St, and ADA improvement along SW 8 St. Responsibilities included supervising inspection staff in the application of Department Procedures and
<br />Standards, monitoring field testing and results, preparing Supplemental Agreements and Work Orders required for implementing contract changes, generating monthly
<br />estimates in Site Manager, preparing final estimate package, working with the Engineer of Record to coordinate design changes and plan revisions, reviewing the project
<br />monthly schedule updates and analyzing construction claims to determine entitlement.
<br />CEI Services 2016
|