My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CE Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CE Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:21:20 AM
Creation date
8/24/2020 11:18:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alexander Vasquez, P.E.9 4 <br />Castillo Engineering, Inc. - Miami, Florida <br />Bachelor of Science in Civil Engineering - <br />Florida International University - August 2009 <br />Professional Engineer: Florida License No. 88521 <br />CTQP Final Estimates – Level I <br />CTQP Earthwork Construction Inspection – Levels I & II <br />CTQP Concrete Field Technician – Level I & II <br />CTQP Asphalt Paving Technician– Levels I & II <br />CTQP Drilled Shaft Inspector <br />SR 9/I-95 at SR 824/Pembroke Road Interchange Improvements Project – FDOT District IV. Project improvements include widening the I-95 off ramps at Pembroke Road to <br />accommodate an additional right turn lane; minor shoulder widening of the I-95 on ramps at Pembroke Road; upgrading the existing traffic signals at the intersections of <br />Pembroke Road and the I-95 off ramps; upgrading the existing lighting along the I-95 on and off ramps at Pembroke Road to LED lighting; reconstructing the sidewalks and <br />pedestrian crossings at the I-95 off ramps and the I-95 northbound on ramp at Pembroke Road; and milling and resurfacing within the project limits. Duties include overseeing <br />and inspecting the contractor’s work and providing inspection reports for roadway and bridge construction operations. In addition, review project MOT, review contract <br />documents (plans and specifications) to mitigate conflicts and resolve contractor RFI’s, and tracked and recorded pay quantities for progress estimates. <br />CEI Senior Roadway Inspector - Pembroke Pines, Florida CEI Services 2019-2020 <br />Reconstruction of SR 836/Dolphin Expressway from NW 57th Ave to NW 17th Ave - Miami-Dade Expressway Authority. This $150 million project increased capacity and improved <br />safety on 4.4 miles of SR 836/Dolphin Expressway from just west of NW 57th Ave to NW 17th Ave. Portions of the expressway were widened to add a lane in each direction, <br />widening of 6 bridges, construction of 4 new bridges and interchange reconstruction improved traffic flow for drivers entering and exiting the expressway. The intersections at NW <br />57th Ave and NW 27 Ave were completely reconstructed with an innovative traffic solution called Diverging Diamond Interchange to improve access to the surrounding areas. <br />Duties include overseeing and inspecting the contractor’s work and providing inspection reports for roadway and bridge construction operations. In addition, review project MOT, <br />review contract documents (plans and specifications) to mitigate conflicts and resolve contractor RFI’s, and tracked and recorded pay quantities for progress estimates. <br />CEI Senior Roadway/Roadway Inspector - Miami, Florida CEI Services 2016-2019 <br />CEI Roadway Inspector - Miami, Florida 2015-2016CEI Services <br />Widening of the Homestead Extension of Florida’s Turnpike (HEFT) from SW 216th Street to Eureka Drive - Florida’s Turnpike. This $41 million project included widening of 4 <br />roadway miles of the Turnpike, 5 bridge widenings and construction of one new bridge over the C-1 Canal, milling and resurfacing, MSE walls, sound walls, installation of new <br />drainage systems, overhead signs, ITS structures, curb & gutter, sidewalk, ADA ramp construction, earthwork operations and testing, erosion control, Maintenance of Traffic, <br />bridge work such as pile driving, footings, columns, pier cap construction, beam installation, bridge deck reinforcing steel inspection and concrete placement, signalization, lighting <br />and landscaping. Duties included preparation of daily reports and final estimates documents, material verification, sampling and testing, review of maintenance of traffic and <br />verification of quantities. <br />Project Manager/Application Engineer - Miami, Florida Construction 2011-2015 <br />Municipal water/wastewater treatment and petroleum industry projects. Duties include assisting with the design and development of engineering system <br />packages for wastewater treatment plants/facilities and oil drilling projects. Providing engineering support for the application and sales of equipment/ <br />products. Conducting on-site system evaluations/inspections to ensure products meet the project requirements and specifications. Reviewing engineering <br />drawings/details and specifications; ensuring selected equipment meets codes, plans and contract documents, and guidelines such as the API (American <br />Petroleum Institute), ISO (International Organization for Standardization), GAGI (Compressed Air & Gas Institute). <br />CTQP Pile Driving Inspector <br />FDOT Advanced MOT <br />FDOT Critical Structures Construction Issues <br />FDOT MSE Wall Inspection <br />ACI Concrete Field Technician <br />FDOT MSE Wall Inspection <br />ACI Concrete Field Technician <br />Nuclear Gauge Safety Certification <br />NPDES Stormwater Management Inspection <br />IMSA Traffic Signal Inspector Level I <br />IMSA Fiber Optic Technician <br />Project Administrator
The URL can be used to link to this page
Your browser does not support the video tag.