Omar Hernandez 11 5CEI Senior Inspector
<br />Castillo Engineering, Inc. - Miami, Florida
<br />Associates Degree in Civil Engineering - Seneca College of
<br />Applied Arts and Technology - Toronto, Canada – 2003
<br />CTQP Quality Control Manager
<br />CTQP Asphalt Plant Technician – Level I
<br />CTQP Asphalt Paving Technician – Levels I & II
<br />CTQP Earthwork Construction Inspection I & II
<br />CTQP Final Estimates – Levels I & II
<br />
<br />Sunrise boulevard from NW 15th Avenue to N Flagler Drive – FDOT IV. This project consists of milling and resurfacing, ADA improvements, new mast arm, new drainage, new
<br />lighting, signalization upgrades, and new signage. Responsibilities include handling and coordinating all construction activities with the contractors and utility companies,
<br />inspection and documentation of daily activities (asphalt, earthwork, drainage, concrete, drilled shafts, signalization, complete lighting inspections), ensuring underground and
<br />roadway construction is completed in accordance with the specifications, reviewing testing results and earthwork records, ensuring compliance with approved MOT plans and
<br />ADA, updating and tracking materials for final material certification, verifying quantities, preparing as-built plans and final estimate documents, public communication and
<br />coordination with businesses and residents. Estimated completion June 2020.
<br />CEI Senior Roadway Inspector - Ft. Lauderdale, Florida CEI Services
<br />Reconstruction and Safety Improvements along SR 907/Alton Road at Michigan Avenue in the City of Miami Beach – FDOT District VI. This $1.5 million project consists of
<br />widening the roadway to accommodate a second southbound left-turn lane at the intersection of Alton Rd and Michigan Ave, installing drainage inlets at various locations,
<br />removing and relocating landscaping as needed, milling and resurfacing, repaving and restriping the roadway, upgrading pedestrian curb ramps to meet ADA requirements,
<br />construction of new sidewalks, installing new traffic and pedestrian signals and signs, installing new street lighting. Responsibilities include handling and coordinating all
<br />construction activities with the contractors and utility companies, inspection and documentation of daily activities, ensuring underground and roadway construction is completed in
<br />accordance with the specifications, ensuring compliance with approved MOT plans, verifying quantities, preparing as-built plans and final estimate documents.
<br />CEI Senior Roadway Inspector - Miami Beach, Florida CEI Services 2019
<br />2016-2019CEI Services
<br />Reconstruction of SR 842/Broward Boulevard from 18th Avenue to US- 1 – FDOT District IV. This $16.0 million project consists of replacing the existing bridge over the North Fork
<br />of the New River, widening the roadway to add bike lanes in each direction, upgrading signalized intersections to mast arms, drainage improvements, milling and resurfacing,
<br />adding roadway lighting, new signing and pavement markings, upgrading crosswalk ramps to meet ADA requirements, relocating bus shelters, construction of new sidewalks,
<br />coordination and supervision of an extensive amount of utility relocation work involving several utility companies, monitoring environmental permit compliance. Responsibilities
<br />include handling and coordinating all construction activities with the contractors and utility companies, inspection and documentation of daily activities, ensuring underground and
<br />roadway construction is completed in accordance with FDOT Specs, ensuring compliance with approved MOT plan, verifying quantities, preparing as-built plans.
<br />CTQP Drill Shaft Inspection
<br />CTQP Concrete Field Technician – Levels I & II
<br />CTQP Pile Driving Inspection
<br />FDOT Advanced MOT
<br />FDOT MSE Wall Inspection
<br />FDOT Auger Cast Pile Inspection
<br />FDOT Critical Structure Construction Issues
<br />ACI Concrete Field Technician - Levels I & II
<br />Nuclear Gauge Safety & HAZMAT
<br />IMSA Traffic Signal Inspector - Level I
<br />NPDES Stormwater Management Inspection
<br />CEI Senior Roadway Inspector - Ft. Lauderdale, Florida
<br />2015-2016CEI Services
<br />Reconstruction of SR 838/Sunrise Boulevard Bridge No.860669 over Middle River – FDOT District IV. This $9.5 million project consisted of replacing the existing bridge that
<br />crosses over Middle River. Also, the construction of a temporary prefabricated bridge (with temporary signalization), permanent signalization, upgrades at major intersections,
<br />drainage improvements, milling and resurfacing, lighting, signing and pavement markings, construction of new sidewalk, landscaping with a gateway architectural wall,
<br />coordination and supervision of an extensive amount of utility relocation work involving several utility companies, close coordination with the Galleria Mall and other local
<br />businesses and stakeholders, monitor environmental permit compliance. Duties included performing inspections, material sampling and testing, conducting maintenance of traffic
<br />reviews, prepare daily reports and document quantities for monthly estimates, assist the contract support specialist with monthly estimates and final estimate package.
<br />CEI Senior Roadway Inspector - Sunrise, Florida
<br />2014-2015CEI Services
<br />Construction of a New Taxi Way at Fort Lauderdale International Airport – Broward County. This $25 million project consisted of the installation of new
<br />drainage system, road reconstruction and widening, construction of the new Taxi Way, expansion of Fort Lauderdale International Airport. Performed
<br />density testing, base inspection and asphalt paving.
<br />CEI Senior Roadway Inspector - Ft. Lauderdale, Florida
|