Laserfiche WebLink
SR 907/Alton Road at Michigan Avenue (Miami Beach, FL) <br />This $1.5 million project consisted of widening the roadway to accommodate a second southbound <br />left-turn lane at the intersection of Alton Road and Michigan Avenue, installing drainage inlets at <br />various locations, removing and relocating landscaping as needed, milling and resurfacing, repaving <br />and restriping the roadway, upgrading pedestrian curb ramps to meet ADA requirements, construction <br />of new sidewalks, installing new traffic and pedestrian signals and signs, installing new street lighting. <br />CEI responsibilities included handling and coordinating all construction activities with the contractors <br />and utility companies, inspection and documentation of daily activities (asphalt, earthwork, drainage, <br />concrete, drilled shafts, signalization, complete lighting inspections), ensuring underground and <br />roadway construction is completed in accordance with the specifications and Contract documents, <br />reviewing testing results and earthwork records, ensuring compliance with approved MOT plans and <br />ADA, updating and tracking materials for final material certification, verifying quantities, preparing <br />as-built plans and final estimate documents, public communication and coordination with businesses <br />and residents. <br />FDOT Dru Badri, P.E. <br />2019 <br />1 <br />(305) 401-1560 <br />CEI Services