Laserfiche WebLink
SR. A1A Indian Creek Drive from Abbott Ave to SR. 907/W <br />63rd St (Miami Beach, FL) <br />This $1.1 million project consisted of milling and resurfacing the entire project limits, upgrading the <br />signalization system of four intersections including pedestrian signals, pedestrian detectors, traffic <br />controller cabinet modifications, reconstruction of intersection ramps to meet ADA requirements, <br />construction of new sidewalks, installation of roadway signs, and adjusting manholes and valves. CEI <br />responsibilities included administering the construction contract, ensuring compliance with <br />specifications, certification packages, and as-built plans, performing monthly schedule reviews, <br />maintaining a constant line of communication with FDOT officials, designers, stakeholders, utility <br />owners, and respective agencies, managing inspection staff, coordinating all work with the contractors, <br />reviewing all lane closure requests, preparing the monthly and final estimates, tracking material <br />submittals, managing and updating the material certification program, analyzing construction claims to <br />determine entitlement, negotiating, generating and processing work orders and supplemental <br />agreements, coordinating/tracking request for information (RFI’s), shop drawings, and plan revisions. <br />FDOT Dru Badri, P.E. <br />2019 <br />2 <br />(305) 401-1560 <br />CEI Services