Laserfiche WebLink
SR 5/Biscayne Blvd from SE 3 Ave to N of SE 2 St & SE 2 Ave <br />from SE 2 St to SE 4 St (Miami, FL) <br />This $5 million project consisted of drainage improvement along Biscayne Blvd in downtown Miami, <br />milling & resurfacing along SR 5 SE 2 Ave from SE 2 St to SE 4 St, flexible pavement reconstruction at <br />the intersection of Biscayne Blvd and Biscayne Blvd way, rigid pavement construction in the widening <br />of the I-95 on ramp, new mast arm installation at SE 2nd Street and SE 2nd Ave, construction of new <br />light poles, and ADA improvements within the project limits. Responsibilities included administering the <br />construction contract, ensuring compliance with specifications, certification packages, and as-built <br />plans, performing monthly schedule reviews, maintaining a constant line of communication with <br />designers, stakeholders, utility owners, and respective agencies, managing inspection staff, <br />coordinating all work with the contractors, reviewing all lane closure requests, preparing the monthly <br />and final estimates, tracking material submittals, managing and updating the material certification <br />program, analyzing construction claims to determine entitlement, negotiating, generating and <br />processing work orders and supplemental agreements, coordinating/tracking request for information <br />(RFI’s), shop drawings, and plan revisions. <br />FDOT Jonathan Fundora, P.E. <br />2019 <br />4 <br />(305) 640-7417 <br />CEI Services