My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CE Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CE Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:21:20 AM
Creation date
8/24/2020 11:18:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR 7/US 441 from NW 29th Street to N of SR 816/Oakland <br />Park Blvd (Oakland Park, FL) <br />This $1.5 million project scope entailed constructing a pedestrian safety barrier along the existing <br />median, constructing a ten-foot shared-use path along SR 7, road widening, milling and resurfacing, <br />upgrading crosswalks, installing landscaping and irrigation in the median, and installing crosswalk curb <br />ramps. CEI responsibilities included handling and coordinating all construction activities with the <br />contractors and utility companies, inspection and documentation of daily activities, ensuring <br />underground and roadway construction is completed in accordance with the specifications and <br />Contract documents, reviewing testing results and earthwork records, ensuring compliance with <br />approved MOT plans and ADA, updating and tracking materials for final material certification, verifying <br />quantities, preparing as-built plans and final estimate documents, public communication and <br />coordination with businesses and residents. <br />FDOT Erik Nemati, P.E. <br />8 <br />(954) 958-7671 <br />2020CEI Services
The URL can be used to link to this page
Your browser does not support the video tag.