|
39
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Sandro Elvir
<br />13.ROLE IN THIS CONTRACT
<br />Survey | SUE Technician
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />23
<br />b.WITH CURRENT FIRM
<br />1
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Miller Legg, Fort Lauderdale, FL
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Associate of Science / Drafting/CAD
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FL / Remote Pilot Certification
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Sandro has more than 22 years of professional surveying experience ranging from a field crew chief to survey manager overseeing survey crews. His areas of expertise in clude land surveying,
<br />boundary, topographic, ALTA, control surveys, utility surveys, 3D Radar Tomography, GPS, r oute surveys, legal descriptions, laser scanning, and construction layout calculations. He is experienced
<br />in AutoCAD, Civil 3D, Cyclone and CloudWorx, and Trimble Geomatics Office. Prior to joining Miller Legg, Sandro was Survey Coordinator Manager with another South Florida surveying firm for 15
<br />years.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Miami Gardens Rolling Oaks Regional Park
<br />Miami Gardens, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />TBD
<br />CONSTRUCTION (If Applicable)
<br />TBD
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Survey Technician: Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building,
<br />renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking
<br />lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irr igation, addition of horseshoe
<br />pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture
<br />and surveying services as a subconsultant to Synalovski, Romanik and Saye Architects.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Miami Beach 20th Street & Sunset Drive Pocket Park
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If Applicable)
<br />2020
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Survey Technician: Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to
<br />provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and
<br />construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and
<br />topographic survey, assisted with the planning of key program elements and performed schematic design, design development,
<br />construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design
<br />(CPTED) principles. Arborist and irrigation design services were also furnished for this project.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Miami-Dade Co. Parks, Recreation & Open Spaces (PROS) Kendall Soccer
<br />Park Survey
<br />Kendall, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size,cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Senior Technician: Miller Legg was selected to provide topographic survey services to Miami-Dade County for the purposes of showing
<br />above-ground improvements and tree locations for an artificial turf replacement project on five (5) soccer fields. The survey was designed
<br />to show rim and invert elevations, pipe and drainage structure sizes.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Miami Dade College (MDC) North Campus Water Loop Phase II
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If Applicable)
<br />TBD
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Survey Technician: As part of the Miami Dade College (MDC) North Campus Water Loop Phase II project, Miller Legg was retained to
<br />provide survey, permitting and engineering services for the required Design Criteria package and preliminary engineering plans for ± 8,300
<br />LF of 6"-12" LF ductile iron pipe fire line and 8,800 LF of 12" potable water line. MDC is enhancing the existing water infrastructure by
<br />replacement of its internal water/fire main system and creation of a campus-wide loop. The firm's survey services cover topographic, as-
<br />builts and record drawings. Scope of services includes preparation of engineering plans including final construction plans, a comprehensive
<br />Design Criteria report, RFQ evaluation and bidding assistance. Miller Legg is also providing final construction plans for the project. This
<br />scope includes an updated topographic survey, underground utility designation and vacuum excavation services, engineering design,
<br />permitting and engineering services during construction for 17,000 LF of water and fire main.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Nicklaus Children's Hospital (NCH) Tomotherapy Building Site Design
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />2018
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Survey Technician: Among the services being rendered by Miller Legg for the Nicklaus Children's Hospital (NCH) main campus new
<br />Tomotherapy building are site plan coordination, landscape architecture/irrigation and civil engineering site design. The landscape
<br />architecture/irrigation services include construction document preparation, bidding and pre-construction assistance, and construction
<br />administration. On the civil side, the firm is handling site civil and utility inf rastructure construction document preparation and agency
<br />permitting, site civil bidding assistance, as well as pre-construction services and construction administration. Permitting is coordinated with
<br />Miami-Dade WASD, Public Works, DERM, Fire and Health Departments. Tree mitigation services involve the creation of a tree
<br />inventory plan and preparation of a tree removal permit application. Miller Legg is performing these services as part of the Pozo
<br />Architect's team.
<br />STANDARD FORM 330 (1/2004)PAGE 2
|