My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synalovski Romanik Saye LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Synalovski Romanik Saye LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:34:48 AM
Creation date
8/24/2020 11:32:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br /> 1 <br />21. TITLE AND LOCATION (City and State) Two Ten Aventura <br />- Aventura, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (if Applicable) <br />2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Two 10 Developers, LLC <br />b. POINT OF CONTACT NAME <br />Pascual Korchmar – Project Manager <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305.466.4243 ext. 205 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />SRS was contracted to provide Architectural and Engineering Services as required for the development of a +/- 89,184 S.F. ,9 story <br />Office Building. Complimented by a +/- 364, 6 story vehicle Parking Garage; slated to be certified LEED Gold for Core and Shell. The <br />ground floor shall provide opportunities for retail and other comm ercial spaces, along with the central lobby for further building floor <br />access. The subsequent 8 floors will have 10 have tenant spaces available, with the ability to be consolidated into larger offices <br />dependent on the tenant business requirements. <br />The linear layout of the site provided a particular challenge to the building program, along with a shared garage, needed to meet the <br />parking threshold for buildings of this nature in the City of Aventura. Coordination with Chabad of Aventura’s (Also designed by SRS, <br />Synagogue - for Services and Pre-School - Class & After School Care), activity schedule had to be achieved for project success. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> Synalovski Romanik Saye, LLC <br />(2) FIRM LOCATION (City and State) <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> Architect <br />b. <br />(1) FIRM NAME <br /> Florida Engineering Services <br />(2) FIRM LOCATION (City and State) <br /> North Miami, FL <br />(3) ROLE <br />MEP Engineers
The URL can be used to link to this page
Your browser does not support the video tag.