My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Beta Jones Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
The Beta Jones Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:39:48 PM
Creation date
8/24/2020 1:39:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Lucas Barroso-Giachetti, P.E., <br />CHMM <br />Senior Environmental Engineer a. TOTAL b. WITH CURRENT FIRM <br /> 19 1.5 <br />15. FIRM NAME AND LOCATION (City and State) <br />Terracon Consultants, Inc. – Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S./Environmental Engineering Florida/Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Certifications: Certified Hazardous Materials Manager (CHMM) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Costco Warehouse Site within SoLe Mia Development <br />North Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Lucas is serving as Senior Environmental Engineer. Providing essential assessment and construction oversight services <br />in support of the site investigation and preparation for development of the project site. Observing relocation and <br />placement of landfill materials and assessing soil and groundwater quality for constituents of concern within the <br />development site. The results will be incorporated into the conditional closure utilizing institutional and engineering <br />controls provided through Miami-Dade County Department of Regulatory and Economic Resources (RER) which will <br />allow effective operation of the site without the expense of having to conduct remediation of impacted material s. Firm’s <br />Fee: $258,950 estimated <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PFAS Assessment of Miami Dade College Academy of Fire <br />Science <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Lucas served as the Technical Lead and Project Manager for assessment of a firefighter training area that historically <br />utilized Aqueous Fire Fighting Foam (AFFF) during training exercise that contained per and polyfluorylakyl substances <br />(PFAS). Terracon was retained by Miami Dade College to assess potential impacts to soil and groundwater from PFAS, <br />including development of a PFAS-focused sampling plan including special and rigorous practices and procedures to <br />prevent cross-contamination during sampling from common everyday items such as water-resistant clothing, sunscreen <br />and others. Firm’s Fee: $27,766 estimated <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pompano Beach Airpark – Plane Crash Fuel Spill <br />Pompano Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Lucas led this project as the Professional Engineer (P.E.) and Project Manager, which involved emergency soil <br />screening, soil sampling, groundwater sampling and source removal oversight related to a discharge of fuel resulting <br />from an emergency aircraft crash landing within the Pompano Beach Airpark. Lucas provided P.E. oversight of the field <br />activities and conducted regulatory interface on behalf of the client with Broward Coun ty. The impacted area was <br />successfully excavated and remediated, receiving a No Further Action (NFA) status from Broward County. Firm’s Fee: <br />$12,198 <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />AAR Aircraft Services (formerly Avborne Heavy <br />Maintenance), Miami International Airport (MIA) <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Lucas performed a comprehensive environmental compliance review of a 250,000-square foot (SF) aircraft <br />maintenance/painting operation for adherence to Miami-Dade County Division of Environmental Resources <br />Management (DERM), Florida Department of Environmental Protection (FDEP), and US Environmental Protection <br />Agency (EPA) guidelines and regulations. Trained several company employees on best management practices and <br />applicable regulations and interfaced with the DERM Airports and Cont racts Section and Miami-Dade Aviation <br />Department (MDAD) representatives during the review process to achieve compliance in many areas related to MIA <br />regulations. Produced plans and management tools for facility managers and staff: Stormwater Pollution Prev ention <br />Plan; Spill Prevention Control and Countermeasures (SPCC); Department of Transportation (DOT) Security Plan;
The URL can be used to link to this page
Your browser does not support the video tag.