Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Rutu Nulkar, P.E. Senior Geotechnical Engineer a. TOTAL b. WITH CURRENT FIRM <br />16 16 <br />15. FIRM NAME AND LOCATION (City and State) <br />Terracon Consultants, Inc. (Fort Lauderdale, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S./Civil Engineering M.S./Civil Engineering Professional Engineer/Florida, Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Affiliations: American Society of Civil Engineers (ASCE) Florida Engineering Society (FES) <br /> Florida Engineering Society/Florida Institute of Consulting Engineers Leadership Institute <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Lauderhill Police Station <br />Lauderhill, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Senior Geotechnical Engineer. The proposed new building includes a 3 - to 5-story police building measuring approximately 55 feet by 110 <br />feet. Terracon performed subsurface exploration and geotechnical engineering services to provide information and geotechnical engineering <br />recommendations relative to: subsurface conditions; gro undwater conditions; site preparation and earthwork; excavation considerations; <br />foundation design and construction; floor slab design and construction; pavement design and construction; and hydraulic condu ctivity (k- <br />value). Terracon is currently in the process of preparing the report for the client, the City of Lauderhill. Firm’s Fee: $6,400 estimated <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />NW 38th Avenue Improvements <br />Lauderhill, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Engineer/Manager. The proposed project includes widening the existing roadway and constructing sidewalks and bus shelters <br />along the proposed corridor. Test borings were drilled to a depth of approximately 15 feet below existing site grades and exf iltration tests <br />were performed to a depth of 10 feet below the existing grades. Terracon performed subsurface exploration and provided geotechnical <br />engineering recommendations relative to subsurface soil (and rock) conditions, groundwater conditions, site preparation and e arthwork, <br />foundations for the proposed bus shelter, and recommendations for the roadway widening and sidewalk construction. Firm’s Fee: $4,017 <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Cooper City Water Treatment Plant (WTP) Water Storage Tank <br />Replacement <br />City of Cooper City, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Senior Geotechnical Engineer. Geotechnical engineering services were performed for the proposed Cooper City WTP Water Storage Tank <br />replacement project located at 11791 SW 49 th Street. Test borings were advanced to depths of approximately 60 to 65 feet below ground <br />surface along the perimeter of the existing wa ter storage tank. The purpose of these services is to provide information and geotechnical <br />engineering recommendations relative to subsurface soil/rock conditions, groundwater conditions, foundation design and constr uction, and <br />earthwork. Firm’s Fee: $7,675 <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Fire Station No. 54 <br />Fort Lauderdale, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2013, 2017 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Engineer/Manager. A three-story fire station building was planned at the northeast corner of NE 32nd Street and NE 32nd Avenue <br />in at the time of Terracon’s initial services from 2012 to 2013. The facility contains an apparatus bay at the west and generator pad on the <br />east. The firm performed geotechnical engineering services that included field exploration comprised of the drilling of borin gs, laboratory <br />testing and geotechnical engineering services. Terracon also provided observation of the installation or the auger cast piles during <br />construction as part of the design team in 2017. We completed the auger cast pile installation monitoring for the 14 -inch auger cast piles <br />(ACPs) for the proposed facility. The firm provided engineering oversight and related testing services during the ACP installation to assure <br />that the work was completed in a manner which met the intent of the project plans and specifications. Our personnel furnish ed full-time <br />observation of the pile installation work and recording such information as total length, rock socket length, grout volume, g rout factor, and <br />reinforcement type and placement procedures. The firm also provided geotechnical consultation service s such as reviewing shop <br />drawings, submittals and responded to requests for information during construction. Firm’s Fee: $19,350 <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Hollywood Community Redevelopment Agency (CRA) <br />Streetscapes <br />Hollywood, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Engineer/Manager. Responsible for the construction materials testing services that were provided for the general cont ractor. The <br />CRA’s project consists of converting three blocks of overhead public utilities to underground including TV, phone and power with hardscape <br />beatification. It also includes beach access street‐end public amenities tied to the Hollywood Boardwalk, paver streets and sidewalks, <br />fountains, wood trellises, mosaic paver inserts, decorative street pole lighting and landscaping installed along with underground utilities, <br />drainage water and sewer service tied to private residences. Terracon’s scope of services consisted of field and laboratory t esting services <br />including field and density tests, moisture density tests, limerock bearing ratio (LBRs), concrete testing, unconfined compressive strength <br />tests, and asphalt testing. Firm’s Fee: $15,040 <br />