My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Reference 2: <br />Client Name: Mr. Dionisio Torres, PE – Public Works Director, Village of Palmetto Bay <br />Address: 9495 SW 180th Street, Palmetto Bay, Florida 33157 <br />Phone/Fax: Phone (305) 969-5011 / Fax: (305) 969-5091 <br />Email: dtorres@palmettobay-fl.gov <br />Project Title: SW 136th Street from US-1 to Cutler Road <br />Work Performed: RJ Behar was responsible for roadway <br />plans, pavement marking and signing <br />plans, Temporary Traffic Control Plans <br />(TTCP), utility coordination, <br />signalization, drainage design and <br />permitting. The improvements will <br />require milling and resurfacing of the <br />existing roadway and pavement <br />widening to accommodate an on-road <br />dedicated bicycle lane. The primary <br />challenge for this project is <br />accommodating the proposed <br />sidewalks and bicycle lanes in a right- <br />of-way constrained corridor. <br />Project Location: Village of Palmetto Bay <br />Year Completed: 09/2019 <br />Team Members: Robert J. Behar, PE – Principal in Charge; Paola Riveros, <br />PE – Project Manager; Hans Murzi, PE – Drainage <br />Engineer; Jose Peña, PE – Structural Engineer <br /> <br /> <br />Reference 3: <br />Client Name: Mr. Karl Kennedy, PE – City Engineer, City of <br />Pembroke Pines <br />Address: 601 City Center Way, Pembroke Pines, Florida 33025 <br />Phone/Fax: Phone (954) 518-9040 / Fax (954) 518-8905 <br />Email: kkennedy@ppines.com <br />Project Title: City Center Traffic Impact Study <br />Work Performed: RJ Behar performed field reviews, data collection, <br />signal timing, LOS Analysis, Review of Traffic Impacts, <br />and compiling a report. The scope of work included <br />traffic data collection, trip generation analysis, trip <br />distribution, trip assignment, crash history and <br />capacity/level-of-service (LOS) analyses. The analyses <br />included eight intersections. <br />Project Location: Charles F. Dodge City Center, City of Pembroke Pines <br />Year Completed: 2019 <br />Team Members: Robert J. Behar, PE – Principal in Charge; Rafael De <br />Arazoza, PE – Project Manager; Michelle Leon, EI – <br />Project Engineer/Data Collection; Hector Rosario, EI – <br />Data Collection <br />F-5
The URL can be used to link to this page
Your browser does not support the video tag.