Laserfiche WebLink
<br /> <br /> <br />F.R. Aleman References <br /> <br />Reference 1: <br />Client Name: Elizabeth Wheaton, City of Miami Beach <br />Address: 1700 Convention Center Drive Miami Beach, FL 33139 <br />Phone/Fax: (305) 673-7000 <br />Email: elizabethwheaton@miamibeachfl.gov <br />Project Title: Topographic Survey and SUE for 11th Street <br />Work Performed: As a subconsultant to A & P Consulting Transportation Engineer, FRA provided <br />miscellaneous survey and SUE services along 11th Street in Miami Beach. Services <br />included topographic survey, underground utility survey, and SUE related work. <br /> Under miscellaneous survey, three steps were developed: <br /> 1) Extend the exiting topographic survey to cover the areas where new design was <br />proposed. Topographic survey shows all above ground features and show <br />elevations at 100-foot intervals (at a minimum). Driveways were located, and <br />elevations shown along the right-of-way lines (back of sidewalk) and extend into <br />the properties to the building lines. <br />− Extend topographic survey approximately 150 linear feet north from the <br />existing topographic information at the intersection with Euclid Avenue. <br />− Extend topographic survey 150 linear feet north and south from the existing <br />topographic information at the intersection with Meridian Avenue. <br />− Extend topographic survey 150 linear feet south from the existing <br />topographic information at the intersection with Jefferson Avenue. <br />− Extend topographic survey 100 feet along 11th Street, east from existing <br />topographic information to approximate the most easterly side of the alley <br />on Block 42. <br /> 2) FRA opened all existing manholes within the pump station area and obtained the <br />invert information, pipe size, and material. FRA also designated all underground <br />utility lines within the pump station area and the adjacent alley. Underground lines <br />were shown on the topographic survey. <br /> 3) As a final step, FRA extended the topographic survey 150 linear feet north from <br />the existing topographic information at the intersection and alleys within the <br />project areas were developed. <br />− Updated topographic survey provided. Creation of the GDTMRD file using <br />the existing topographic information and combined it with the additional <br />topographic/DTM information to be collected by FRA. <br />− Obtained the drainage and sewer information along the corridor. <br /> FRA extended the existing baseline of survey as shown on survey provided easterly <br />to Washington Avenue and Westerly to Alton Road. Right-of-way lines along Lennox <br />Avenue, Michigan Avenue, and Pennsylvania Avenue shown on topographic file. <br />The topographic survey was referenced to Florida State Plane Coordinate System, <br />North American Datum 1983, Adjustment 1990 (NAD83/90). <br /> <br />F-6