Laserfiche WebLink
12. NAME <br />Bunt Baldo, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev person.) <br />Roadway <br />14. YEARS EXPERIENGE <br />a. TOTAL I b. WITH CURRENT FIRM <br />27 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimle -Horn and Associates, Inc., Miami, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science / Civil Engineering / Florida International University / FL / Professional Engineer / 53120 / 1998 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Has 27 years of experience in civil engineering with 20 years of extensive experience in the field of highway design, drainage design, and traffic <br />operations plans. FDOT Advanced Work Zone Traffic Certification; FDOT Advanced Traffic Control Certification; FDOT Specifications Certification; <br />Troxler Electronic Laboratories Certification; American Society of Civil Engineers (ASCE), member; American Society of Highway Engineers, <br />member. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-112- <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Pedestrian Bridge Design and Roadway Improvements (NW 175th Street <br />and NW 42nd Avenue), Miami Gardens <br />2019 <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />a. <br />Project engineer on the Kimley-Horn team selected by the City for the design and construction of a new pedestrian bridge. The current <br />bridge is two lanes with a raised pedestrian sidewalk along the north side. Services our team provided included intersection improvements, <br />signing/pavement markings, sidewalk and ADA improvements, signal modifications, and structural engineering, including bridge evaluation, <br />rehabilitation, design, permitting, and coordination with FDOT to comply with Local Agency Program (LAP) funding. <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />SR 826/Palmetto Expressway from W of SR 823/NW 57th Avenue to W of <br />SR 817/NW 27th Avenue, FDOT District Six, Miami -Dade County, FL <br />2013 <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />b. <br />Project manager and engineer of record. The scope includes roadway design, drainage design, ADA compliance, pavement design, local <br />agency coordination, public involvement, maintenance of traffic, bridge expansion joint replacement, permitting, utilities coordination, and <br />signing and pavement markings. Construction Cost: $1 million <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if applicable) <br />MDX Design Engineering for SR 874 (Don Shula Expressway) from <br />Kendall Drive to SR 826, Miami, FL <br />2009 <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Deputy project manager for design engineering services for SR 874 (Don Shula Expressway) roadway modifications from south of SW 88th <br />C. <br />Street (Kendall Drive) to south of SR 826 (Palmetto Expressway)/SR 874 interchange. The project consisted of the widening of SR 874 and <br />included complex roadway design, drainage design, signing and marking, lighting, signalization, retaining walls, noise barrier walls, bridge <br />widening plans, permitting, and public involvement services. The nature of the project changed and was re -procured as a Design -Build <br />project. Kimley-Horn prepared 99% design plans and the subsequent design -build criteria package. Construction Cost: $4.3 million <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />1.95 HOV Lane Widening at SR 80 Overpass and Reconstruction of SR 80 <br />Interchange, FDOT District Four, Palm Beach County, FL <br />2004 <br />2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Served as project manager. Kimley-Horn provided fast-track design services for the reconstruction of the SR 80 bridges over 1-95 and the <br />widening of a 4,000 -foot section of 1-95 under the bridges from a 6 -lane section to a 10 -lane section, including two HOV and two 0.75 -mile <br />auxiliary lanes. Also provided drainage, lighting, overhead sign, and underground utility design services. Construction Cost: $34.4 million <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />Okeechobee Road (SR 25) from East of NW 87 Avenue to NW 79 Ave, <br />FDOT District Six <br />1 2020 <br />2020 <br />e. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I [X] Check if project performed with current firm <br />Project manager for final design services for the reconstruction of a 3/4 -mile section of Okeechobee Road in Miami -Dade County. Services <br />include widening the existing road to 4 lanes in each direction; widening the NW 79th Avenue Bridge over the Miami (C-6) Canal. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-112- <br />