Laserfiche WebLink
12. NAME <br />Artem Strunnikov, P.E. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Roadway <br />14. YEARS EXPERIENCE <br />a. TOTALFl. WITH CURRENT FIRM <br />8 7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimle -Horn and Associates, Inc., Miami, FL <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor of Science / Civil Engineering / Florida International University FL / Professional Engineer / 84785 / 2018 <br />/2014 FL / Engineering Intem / 1100018412 / 2014 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Drainage design analyst for roadway and drainage improvements and has 8 years of experience. His responsibilities include development of <br />roadway and drainage cross sections, roadway alignment, temporary drainage plans for an emergency trunk line, pre- and post -design water <br />treatment calculations, exfiltration trench calculations and design, utility coordination, stormwater pollutions prevention plans (SWPPP), review of <br />as-builts, and signing and pavement markings. American Society of Civil Engineers (ASCE), member. <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-113- <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Okeechobee Road (SR 25) from East of NW 87 Avenue to NW 79 Avenue, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />FDOT District Six <br />2020 <br />2020 <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Drainage design analyst for final design services for the reconstruction of a 3/< -mile section of Okeechobee Road in Miami -Dade County. <br />Services include widening the existing road to 4 lanes in each direction; widening the NW 79th Avenue Bridge over the Miami (C-6) Canal. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />SR 826/Palmetto Expressway from W of SR 8231NW 57th Avenue to W of <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />SR 817/NW 27th Avenue, FDOT District Six, Miami -Dade County, FL <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE jx] Check if project performed with current firm <br />b <br />Drainage and roadway design engineer. Kimley-Horn was selected by FDOT District Six to provide consulting engineering services for SR <br />826/Palmetto Expressway in Miami -Dade County: from East of SR 823/NW 57th Avenue to west of SR 817/NW 27th Avenue. Responsible <br />for drainage cross section preparation, design of swales, pavement design, roadway and signing and marking plans. The project scope <br />includes roadway design, drainage design, ADA compliance, pavement design, local agency coordination, public involvement, maintenance <br />of traffic, bridge expansion joint replacement, permitting, utilities coordination, and signing and pavement markings. <br />(1) TITLE AND LOCATION (Cityand State) <br />2 YEAR COMPLETED <br />Palmetto Express Segment 2 Design, from North Canal C-8 Bridge/1162nd <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Street to East of NW 67th Avenue, FDOT District Six, Miami -Dade County <br />Ongoing <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />C. <br />Drainage designer for this major roadway improvement project. Kimle -Horn's scope as a subconsultant to another firm includes lighting <br />9 9 1 Y p p l Y p( ) 9 9 <br />design and drainage design for the entire segment. The project entails shifting the alignment of the road and encroachment into Peter's Pike <br />Canal; reconstruction of frontage roads, noise walls, single point urban interchange, bridge widening and extensive coordination with FGT <br />due to the presence of gas mains within the project limits. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Florida's Turnpike Widening from Glades Road to Atlantic Avenue, <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Florida's Turnpike Enterprise, Palm Beach County, FL <br />Ongoing <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />d. <br />Drainage design engineer assisting with hydroplaning analysis, spread analysis, and water quality calculations for the widening design of <br />the Turnpike mainline from 6 to 10 lanes, including express lanes. Design services include stabilizing the Lake Worth Drainage District <br />(LWDD) E -2W canal bank to support the project's widening, replacing the Yamato Road bridge over the Turnpike, widening the bridge over <br />Clint Moore Road, replacing the bridge over L-38 Canal, designing noise barriers, roadway lighting, signing and pavement markings and <br />utility coordination. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />Florida's Turnpike Mainline Widening PD&E Study and Design, Boynton <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />Beach to Lake Worth, Florida's Turnpike Enterprise, FL <br />2006 <br />I <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />e. <br />Project Analyst. Provided maintenance of traffic plans for reconstruction of existing four -lane to eight lane divided expressway that includes <br />a new Interchange and conversion of mainline barrier plaza into full 8 -lane open road tolling (ORT) expressway complete with ramp manual <br />tolling. The project encompasses roadway widening, bridge widening and replacements, and 2,500 -ft. of a major Lake Worth Drainage <br />District Canal relocation. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />-113- <br />