My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />1-75 Express Lanes (Segments A & B) Design -Build from NW PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />170th Street to South of Miramar Parkway, FDOT District, 2019 2019 <br />Fort Lauderdale, FL <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />FDOT District Four Rob Bostian, P.E. (954) 777-4635 <br />F DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Kimley-Horn provided structural, roadway, <br />signing and pavement marking design, ITS plans, <br />and post-design/construction phase services for <br />this design -build project as a subconsultant to <br />another firm. Our responsibilities included <br />structural plans for two steel box girder bridges, <br />four precast/prestressed concrete beam bridges, <br />and all retaining walls, toll gantries, and overhead <br />sign structures. This 3.1 -mile segment was the <br />largest and most complex segment of the 1-75 <br />corridor. The project won an ENR Southeast <br />2019 Award of Merit for Structural Design. <br />Project Construction Cost: $233M <br />Size: 3.1 miles <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />-124- STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />a. <br />Kimley-Horn and Associates, <br />West Palm Beach, FL <br />Structural Engineering <br />Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />d. <br />-124- STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.