My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) 6 <br />21. TITLE AND LOCATION (city and State) 22. YEAR COMPLETED <br />Venetian Causeway Improvements from Bayshore Drive PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />(Miami) to Alton Road (Miami Beach), FL 2013 1 2013 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Miami -Dade County Public Works Lana Moorey, P.E. (305) 375-2863 <br />Department <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, <br />Kimley-Horn provided design and construction phase services for <br />improvements to the section causeway east of the Miami toll plaza to <br />east of Island Avenue in Miami Beach. Our team developed a traffic <br />study, vertical and horizontal alignments, coordinated drainage design, <br />signing and pavement masking, hardscape/irrigation, signalization, and <br />signing and making plans. <br />Services included: Master plan development and implementation, <br />roadway improvement design, landscape architecture, environmental <br />permitting, drainage, value engineering, assistance to the county with <br />access management, and agency coordination. <br />Relevant to this project: Streetscape improvements and drainage design <br />for Miami -Dade County and agency coordination <br />Project Construction Cost: $8M <br />Size: 2.4 miles of causeway beautification enhancements <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-128- <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />Kimley-Horn and Associates, <br />Miami, FL <br />Project Management, Master Plan <br />a• <br />Inc. <br />Development/Implementation-, Transportation <br />Planning, Roadway Design <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />Kimley-Horn and <br />Miami, FL <br />Landscape Architecture; Permitting <br />Associates, Inc. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (CityandState) <br />(3) ROLE <br />d. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-128- <br />
The URL can be used to link to this page
Your browser does not support the video tag.