My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. 8 <br />Complete one Section F for each ro ect. <br />21. TITLE AND LOCATION (Cityand State) 22. YEAR COMPLETED <br />Capital Cascades Pedestrian Bridge, Blueprint 2000, PROFESSIONAL SERVICES CONSTRUCTION (It'applicable) <br />Tallahassee, FL 1 2015 1 2016 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CON IAC I I ELEPHUNL NUMbLK <br />Blueprint 2000 & Beyond Gary Phillips (850) 701-2740 <br />24. BRIEF DESCRIPTION OF <br />scope, size, and cost) <br />The Capital Cascades Connector Bridge crosses over South Monroe Street (SR 61) and connects the Capital Cascades Trail — <br />Segment 2 (Cascades Park) with Capital Cascades Trail — Segment 3. The project limits extended from the east end of CCT — <br />Segment 2 just south of the Van Buren Electric Building parking on the west side of Gadsden Street to the east side of South Adams <br />Street. This is a trail distance of approximately 1,150 feet including the bridge. The project design included a sustainable design <br />approach including Xeriscaping, use of rain gardens and bioswales, low energy lighting, and recycled materials; controlling and <br />mitigating impacts to a lined and buried landfill; and minimizing and controlling traffic impacts to South Monroe Street, a highly <br />traveled state roadway. Winner, 2017 Florida Institute of Consulting Engineers/ACEC Florida Engineering Excellence Award. <br />Trail distance: approximately 1,150 feet including the bridge <br />Project Construction Cost: $6M <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-130- <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />Kimley-Horn and Associates, <br />Tallahassee, FL <br />Site Civil Engineering; Site Civil Permitting; <br />a• <br />Inc. <br />Landscape Design; Traffic Control Design <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />d. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-130- <br />
The URL can be used to link to this page
Your browser does not support the video tag.