Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />From Section E, Block <br />( 12 ) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. <br />Place `�C" under project key number for participation in same or similar role.) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />Anthony Alfred, P.E. <br />MOT; Utilities Coordination <br />2 <br />from NW 170th Street to South of Miramar Parkway, <br />X <br />Lowson Boulevard Pedestrian Bridges <br />FDOT District <br />3 <br />Artem Strunnikov, P.E. <br />Roadway <br />Capital Cascades Pedestrian Bridge <br />4 <br />Okeechobee Road (SR 25) from East of NW 87 <br />X <br />X <br />Avenue to NW 79 Avenue <br />5 <br />Burt Baldo, P.E. <br />Roadway <br />Pedestrian Bridge Design and Roadway Improvements <br />296th Street to South of SW 232nd Street <br />X <br />X <br />X <br />X <br />Derrick Lewis, P.E. <br />Environmental Engineering <br />and Stormwater Drainage <br />Design <br />X <br />X <br />George Puig, PLA, ASLA <br />Landscape Architecture <br />X <br />Jamea Long, P.E. <br />Structural Engineer <br />X <br />X <br />X <br />X <br />X <br />X <br />Jerry, Piccolo, P.E. <br />Structural Engineer <br />X <br />X <br />X <br />Jorge Perez, P.E. <br />Structural Engineer <br />Juan Jimenez, P.E. <br />General Civil Engineering <br />X <br />Juan Fuentes, P.E., S. E., <br />LEED AP <br />Elevator Shaft, Stairs <br />Maggie Giraldo, P.E. <br />Environmental Engineering <br />and Stormwater Drainage <br />Design <br />X <br />Tori Bacheler <br />Permitting <br />X <br />29. EXAMPLE PROJECTS KEY <br />NO. <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />NO. <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />1 <br />Brickell City Centre <br />6 <br />Venetian Causeway Improvements from Bayshore Drive <br />(Miami) to Alton Road <br />1-75 Express Lanes (Segments A & B) Design -Build <br />2 <br />from NW 170th Street to South of Miramar Parkway, <br />7 <br />Lowson Boulevard Pedestrian Bridges <br />FDOT District <br />3 <br />Sunny Isles Beach Government Center Annex <br />8 <br />Capital Cascades Pedestrian Bridge <br />4 <br />Okeechobee Road (SR 25) from East of NW 87 <br />9 <br />Dixie Highway Flyover Design -Build <br />Avenue to NW 79 Avenue <br />5 <br />Reconstruction of Krome Avenue from South of SW10 <br />Pedestrian Bridge Design and Roadway Improvements <br />296th Street to South of SW 232nd Street <br />(NW 175th Street and NW 42nd Avenue) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br />-133- <br />