My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br />QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. 10 <br />Complete one Section F for each <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Pedestrian Bridge Design and Roadway Improvements (NW PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />175th Street and NW 42nd Avenue), Miami Gardens, FL 2012 1 2012 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POIN I UI- GUN IAC I I ELLPHUNE NUM13LK <br />City of Miami Gardens Osdel F. Larrea (305) 622-8004 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Kimley-Horn was selected by the City for the design and construction of a new pedestrian bridge. The purpose of this project was to <br />provide pedestrian access along the north side of NW 175th Street and NW 173rd Drive—across a Miami -Dade County canal— <br />between NW 42nd Avenue and NW 42nd Court. The current bridge is two lanes with a raised pedestrian sidewalk along the north <br />side. Services our team provided included intersection improvements, signing/pavement markings, sidewalk and ADA <br />improvements, signal modifications, and structural engineering, including bridge evaluation, rehabilitation, design, permitting, and <br />coordination with FDOT to comply with Local Agency Program (LAP) funding. <br />Net Fee: $86,423 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-132- <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />Kimley-Horn and Associates, <br />Miami, FL <br />Intersection improvements-, Signing/pavement <br />a. <br />Inc. <br />markings-, sidewalk and ADA improvements <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />b. <br />Kimley-Horn and Associates. <br />West Palm Beach, FL <br />Structural-, Bridge Evaluation, Rehabilitation, Design <br />Inc. <br />and Permitting <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />d. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />-132- <br />
The URL can be used to link to this page
Your browser does not support the video tag.