|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Kenneth Douglas Design Principal a. TOTAL b. WITH CURRENT FIRM
<br />31 2*
<br />15. FIRM NAME AND LOCATION (City and State) *Note that in 2018 HLB acquired
<br />HLB Lighting Design - New York, NY Illumination Arts.
<br />16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE)
<br />Thomas Edison State College, Bachelor of Arts N.A.
<br />Baruch College, Coursework in Business Management Please note lighting design in an unlicensed profession
<br />Fashion Institute of Technology, Coursework in Architectural Lighting
<br />State University of New York at Purchase, Theater Lighting Program
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: FIALD, MIES, LC, LEED AP
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />180-
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing I
<br />CONSTRUCTION(ifapplicab/e)
<br />Ongoing
<br />Miami I-395 Bridge, Miami, FL
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />a.
<br />Principal in Charge: full lighting design and consulting services for the preparation of the Final Design Documentation for the
<br />1-395 Miami Project. Our scope includes the Signature Bridge, Main Span Arch and Hanger Cables, Bridge Piers and Abut-
<br />ments, Pedestrian Pathway/Heritage Park under Signature Bridge and elevated highway, from Biscayne Boulevard to Over -
<br />town.
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Samuel De Champlain Bridge, Montreal, Quebec
<br />2019
<br />2019
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />b.
<br />Principal in Charge:. As part of the design/build team commissioned to conceive and construct this dramatic cable stayed
<br />bridge, HLB spent over five years meticulously developing a complex dynamic lighting design that visually represents the
<br />diverse population that calls both Montreal and Canada home.
<br />Cost: $4.2 B
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />1-4 Ivanhoe Gateway Pedestrian Bridge, Orlando, Florida
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifapplicable)
<br />2009
<br />1 N.A.
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />c.
<br />Principal In Charge - Preliminary aesthetic lighting for preliminary concepts for this signature pedestrian bridge, including participation in
<br />stakeholder meetings. (Project on hold)
<br />(1)TITLE AND LOCATION (City and State)
<br />YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifapplicab/e)(2)
<br />Downtown East Commons, Minneapolis, MN
<br />2014
<br />1 2017
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />d•
<br />Principal in Charge - Five acre downtown park in the heart of Minneapolis. Lighting goals included assuring the park became a night time
<br />destination, assuring visitor safety and a visually interesting night time environment. The lighting for the park was designed to support this
<br />wide array of uses. Direct illumination of open areas and pedestrian paths are provided by pole mounted, adjustable LED luminaires arrayed
<br />throughout the park and organized to keep the large lawns free of obstructions. $18 M.
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifapplicab/e)
<br />Genoa Park Stairs, Columbus, OH
<br />2015
<br />2015
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />e.
<br />Principal in Charge - The Genoa Park Stairs create a playful new presence on the city's skyline, engaging and enticing both locals and tourists
<br />alike. Envisioned as a central nighttime element of this riverfront park, the Genoa Park Stairs transforms an existing concrete amphitheater
<br />into a dramatic and experiential nighttime lighting event.
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />180-
<br />
|