|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />Simi Burg
<br />15. FIRM NAME AND LOCATION (City and State)
<br />HLB Lighting Design - Miami, FL
<br />16. EDUCATION(DEGREEAND SPECIALIZATION)
<br />Penn State University,
<br />Bachelor of Architectural Engineering
<br />13. ROLE IN THIS CONTRACT
<br />Principal in Charge
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: Assoc. IALD, MIES, LC
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />11 1 g
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE)
<br />N.A.
<br />Please note lighting design in an unlicensed profession
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />181-
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />The Miami Underline Phase I, Miami, FL
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION(ifapplicable)
<br />2020
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />a.
<br />Project Manager - The Underline transforms the land below Miami's Metrorail into a 10 -mile signature linear park, urban trail, and living art
<br />destination in order to create a safer, healthier, more connected and engaged community. HLB designed illumination strategies for the park
<br />that will lend to safety, mobility and a sense of place through the park.
<br />Cost: $155 M
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Miami Baywalk Riverwalk, Miami, FL
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (if applicable)
<br />1 Ongoing
<br />b.
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Manager - Project to be a conceptual, branding, and implementation strategy to unify almost 5 miles of the Miami waterfront property
<br />to transform the Baywalk into an amenity with a clear identity that highlights Miami's competitive positioning in the local, state, national and
<br />international markets.
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />St. Tropez Office Tower, Sunny Isles, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifapplicab/e)
<br />2020
<br />1 2020
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />C.
<br />Pricncipal in Charge: The St. Tropez Milton Tower is a class A iconic office building that sits at the gateway of Sunny Isles. The lighting concept
<br />for the building fagade which is highly visible at the major intersection includes static white linear lighting tightly integrated into the facade fins,
<br />back lighting of perforated metal, and architectural sconces with laser tight optics at each balcony to provide the illusion of a continuous line
<br />of light drawn up to the top of the building.
<br />(1)TITLE AND LOCATION (City and State)
<br />YEAR COMPLETED
<br />Tampa Waterfront Curtis Hixon Park, Tampa, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (il applicable)(2)
<br />2011
<br />2011
<br />(3). BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />d.
<br />Project Manager -The Tampa Park includes a 2.4 acre tract of urban waterfront land and was the first site acquired as part of Mayor Dick Greco's
<br />plan to integrate the city's waterfront parks into a connected system. The site will allow direct pedestrian links to several popular downtown
<br />Tampa destinations such as The Convention Center, The St. Petersburg Times Forum and the Florida Aquarium. An expanded recreational
<br />green space will provide a welcome respite for the thousands of people who live and work downtown.
<br />(1)TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Lincoln Road Master Plan, Miami Beach, FL
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (if applicable)
<br />I Ongoing
<br />(3). BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />e•
<br />Project Manager - The lighting for the redevelopment of the Lincoln Road Mail is designed to transform the renowned 10 City Block pedestrian
<br />way into a magical nighttime experience that celebrates and enhances the revered historical architecture, provides visual cues to assist with
<br />wayfnding and safety, engages the community to create an interactive attraction and enhances the retail experience.
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />181-
<br />
|