Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 1 <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />Miami 1-395 Bridge, Miami, FL <br />23. PROJECT OWNER'S INFORMATION <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES �CONSTRILK <br />Ongoing Onqc <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />FDOT Jay Chiglo (HDR) 813.282.2300 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br />(if applicable) <br />HLB is providing full lighting design and consulting services for the preparation of the Final Design Documentation for <br />the 1-395 Miami Project. Our scope includes the Signature Bridge, Main Span Arch and Hanger Cables, Bridge Piers and <br />Abutments, Pedestrian Pathway/Heritage Park under Signature Bridge and elevated highway, from Biscayne Boulevard to <br />Overtown. <br />Cost: N.A. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (612004) PAGE 3 <br />182- <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />HLB Lighting Design <br />New York, NY <br />Architectural Lighting Design <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (Cityand State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (612004) PAGE 3 <br />182- <br />