Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT 1 14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br />Charles Grew, PE, CxA, LEED Electrical Engineering 23 11 <br />Green Associate, NCTI <br />15. FIRM NAMEAND LOCATION (Cityand State) <br />19 GannettFiteming Camp Hill, PA _ __ _ <br />16. EDUCATION (Degree and Specialization) _ 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS/Electrical Engineering Technology PE: PA, NV, AZ, NJ, CO, NC, WV, SC, MT, NY <br />USGBC - LEED Green Associate - No. 10427084 <br />Certified Commissioning Authority (CxA): AABC Commissioning Group <br />- No. 412-1003 <br />FHWA-NHI-130110 Tunnel Safety Inspection Training (NCTI): National <br />Highway Institute <br />Amtrak Contractor <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Electrical Engineer designing electrical systems for commercial, transportation, and industrial facilities projects. Prepares designs and plans, <br />specifications, and cost estimates for medium- and low -voltage switchgear and distribution, lighting, general power, fire alarm, intrusion detection, <br />closed-circuit television (CCTV), and instrumentation and control (I&C) systems. Work also involves construction services, such as reviewing shop <br />drawings and responding to requests for information (RFIs). <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />- <br />... ...... .... —---- ----- <br />— <br />PROFESSIONALSERVICCONSTRUCTION (ifAppl.) <br />Rail Station Elevator Analysis, Ft. Lauderdale, FL 2020 N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />aSFRTA. Electrical Engineer performing site surveys, condition assessments, and code compliance analysis of twelve existing rail stations. <br />Each station generally had two elevators and a pedestrian overpass for patrons to navigate from one platform to another. Performed a <br />detailed site survey at each station to analyze elevator lobbies, pits, shafts, and machine rooms for code compliance and to assess the <br />condition of currently installed electrical and fire alarm equipment. Provided the client with information regarding equipment condition and <br />recommended elevator modernizations along with approximate modification costs. <br />(1) TITLEAND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION(ifAppl.) <br />Henry Kinney Tunnel Design Services, Fort Lauderdale, FL 2018 N/A <br />b (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />FDOT District 4. Lead Electrical Tunnel Inspector for an 864 -foot -long tunnel. This tunnel is a two -bore system with two-lane vehicular traffic <br />in each bore. Work was comprised of noninvasive (visual) inspection of electrical systems in accordance with the National Tunnel Inspection <br />Standards (NTIS) requirements. The inspection resulted in a comprehensive report and tabulation of Specifications for the National Tunnel <br />Inventory (SNTI) elements quantities. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Henry E. Kinney Tunnel In -Depth Inspection and Testing, Fort PROFESSIONAL SERVICES CONSTRUCTION (ifAppl.) <br />Lauderdale, FL 2013 N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />FDOT District 4. Electrical Engineer for the inspection and condition report of a tunnel that carries four lanes of highway underneath various <br />C. roads in Florida. The tunnel has numerous support areas, including pump rooms and vaults, containing electrical equipment. Performed <br />an electrical inspection of the tunnel and support space lighting, lighting controls, normal and emergency power systems, panelboards, <br />transformers, tunnel ventilation fan motor starters, and generator. Additional systems inspected included the intercom system and the traffic <br />control system. Provided comprehensive lighting analysis of lighting levels throughout the tunnel, which included field measurements of the <br />tunnel roadway lighting. Prepared a report of findings, including recommendations for repair, operational testing results, and comparisons to <br />recommended electrical codes and standards. <br />AUTHORIZED FOR LOCAL REPRODUCTION -194- <br />STANDARD FORM 330 (12004) PAGE E-3 <br />