|
15. FIRM NAME AND LOCATION (City and State)
<br />9 Gannett Fleming Camp Hill, PA
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BS/Mechanical Engineering N/A
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mechanical Designer responsible for coordinating mechanical design, including heating, ventilation, and air conditioning (HVAC) system layout,
<br />heat load calculations, equipment selections, and generating drawing sets. Experienced in computer applications such as Revit, AutoCAD,
<br />Bluebeam, and Microsoft Office.
<br />(1) TITLE AND LOCATION (City and State)
<br />Fulton Theatre Expansion Phase 1, Lancaster, PA
<br />19. RELEVANT PROJECTS
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES i CONSTRUCTION(ifAppL)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />Fulton Theatre Company. Mechanical Designer providing HVAC design services for the renovation and addition of the Fulton Theatre's
<br />apartments, offices, and performance -related spaces. Phase 1 of the project focuses the historic south end of the building, renovating
<br />the existing retail spaces, and providing new apartments for the actors and actresses. Phase 2 will focus on the north end of the building,
<br />updating the atrium and dressing rooms, adding new office spaces, and a new dance studio. Work includes modeling HVAC systems,
<br />selecting equipment, generating deliverables, and coordinating the Building Information Modeling(BIM) with other disciplines.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Tayac Elementary School HVAC System Replacement,
<br />Prince George's County, MD
<br />---- —
<br />----- -- - .....
<br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION(ifAppl.)
<br />Ongoing Ongoing
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />b. Prince George's County Public Schools. Mechanical Designer for HVAC design services for the replacement and upgrade of existing HVAC
<br />systems serving the elementary school. Upgrades include replacing existing dual -fuel boilers with gas-fired condensing boilers, replacing
<br />existing unit ventilators and window AC units with dual -temp unit vents, and adding an air-cooled chiller with a dual -temp two pipe system.
<br />Work includes surveying the existing conditions, modeling HVAC systems, generating drawing sets, and coordinating with other disciplines
<br />and subconsultants.
<br />(1) TITLEAND LOCATION (City and State)
<br />GCT Station Master's Office, Fire Command Center, Police Canine,
<br />and Madison Garage Storage - Design Services, New York, NY
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (ifAppL)
<br />Ongoing Ongoing
<br />C. (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />MTA Metro -North Railroad. Mechanical Designer for providing HVAC design services for the renovation of the Station Master's Office (SMO)
<br />located in New York City's Grand Central Terminal (GCT). Renovations includes a new fire command center and upgrades to office and
<br />mechanical spaces. Work includes surveying the existing conditions, receiving a Metro North Contractor certification, performing HVAC duct
<br />calculations, drafting existing and new HVAC systems.
<br />AUTHORIZED FOR LOCAL REPRODUCTION -195-
<br />STANDARD FORM 330 (12004) PAGE E•4
<br />
|